Subpart VVVV - Subpart VVVV—Standards of Performance for Large Municipal Waste Combustors
INTRODUCTION
§ 60.5680 - What does this subpart do?
§ 60.5685 - When does this subpart become effective?
APPLICABILITY
§ 60.5690 - Does this subpart apply to my municipal waste combustor?
§ 60.5695 - What is a new municipal waste combustor?
§ 60.5700 - Does this subpart allow any exemptions?
§ 60.5705 - Do other new source performance standards also apply to my municipal waste combustor?
§ 60.5710 - What authorities to enforce these federal new source performance standards can the Administrator delegate to a state agency?
§ 60.5715 - How are these new source performance standards structured?
§ 60.5720 - Do all five components of these new source performance standards apply at the same time?
§ 60.5725 - Are there different subcategories of municipal waste combustors within this subpart?
PRECONSTRUCTION REQUIREMENTS: MATERIALS SEPARATION PLAN
§ 60.5730 - Who must submit a materials separation plan?
§ 60.5735 - What is a materials separation plan?
§ 60.5740 - What steps must I complete for my materials separation plan?
§ 60.5745 - What must I include in my draft materials separation plan?
§ 60.5750 - How do I make my draft materials separation plan available to the public?
§ 60.5755 - When must I accept comments on the materials separation plan?
§ 60.5760 - Where and when must I hold a public meeting on my draft materials separation plan?
§ 60.5765 - What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
§ 60.5770 - What must I do with my revised materials separation plan?
§ 60.5775 - What must I include in the public meeting on my revised materials separation plan and siting analysis?
§ 60.5780 - What must I do with any public comments I receive on my revised materials separation plan?
§ 60.5785 - How do I submit my final materials separation plan?
PRECONSTRUCTION REQUIREMENTS: SITING ANALYSIS
§ 60.5790 - Who must submit a siting analysis?
§ 60.5795 - What is a siting analysis?
§ 60.5800 - What steps must I complete for my siting analysis?
§ 60.5805 - What must I include in my siting analysis?
§ 60.5810 - How do I make my siting analysis available to the public?
§ 60.5815 - When must I accept comments on the siting analysis and revised materials separation plan?
§ 60.5820 - Where and when must I hold a public meeting on the siting analysis?
§ 60.5825 - What must I do with any public comments I receive during the public comment period on my siting analysis?
§ 60.5830 - How do I submit my siting analysis?
GOOD COMBUSTION PRACTICES: OPERATOR TRAINING
§ 60.5835 - What types of training must I do?
§ 60.5840 - Who must complete the operator training course? By when?
§ 60.5845 - Who must complete the site-specific training course?
§ 60.5850 - What site-specific training must I provide?
§ 60.5855 -
§ 60.5860 - Where must I keep the site-specific operating manual?
GOOD COMBUSTION PRACTICES: OPERATOR CERTIFICATION
§ 60.5865 - What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.5870 - After the required date for operator certification, who may operate the municipal waste combustor?
§ 60.5875 - What if all the certified operators must be temporarily offsite?
GOOD COMBUSTION PRACTICES: OPERATING REQUIREMENTS
§ 60.5880 - What are the operating practice requirements for my municipal waste combustor?
§ 60.5885 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?
EMISSION LIMITS
§ 60.5890 - What pollutants are regulated by this subpart?
§ 60.5895 - What emission limits must I meet? By when?
§ 60.5900 - What happens to the emission limits during periods of startup, shutdown, and malfunction?
CONTINUOUS EMISSION MONITORING
§ 60.5905 - What types of continuous emission monitoring must I perform?
§ 60.5910 - What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.5915 - How are the data from the continuous emission monitoring systems used?
§ 60.5920 - How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.5925 - What is my schedule for evaluating continuous emission monitoring systems?
§ 60.5930 - What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.5935 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.5940 - How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.5945 - What is required for my continuous opacity monitoring system and how are the data used?
§ 60.5950 - What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.5955 - What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
STACK TESTING
§ 60.5960 - What types of stack tests must I conduct?
§ 60.5965 - How are the stack test data used?
§ 60.5970 - What schedule must I follow for the stack testing?
§ 60.5975 - What procedures and test methods must I use to stack test?
§ 60.5980 - May I conduct stack testing less often?
§ 60.5985 - May I conduct continuous monitoring or sampling in lieu of stack testing?
OTHER MONITORING REQUIREMENTS
§ 60.5990 - Must I meet other requirements for continuous monitoring?
§ 60.5995 - How do I monitor the load of my municipal waste combustor?
§ 60.6000 - How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.6005 - How do I monitor the injection rate of activated carbon?
§ 60.6010 - What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
§ 60.6015 - What requirements must I meet for estimating my municipal waste combustor capacity?
§ 60.6020 - What records must I keep?
§ 60.6025 - Where must I keep my records and for how long?
§ 60.6030 - What records must I keep for the materials separation plan and siting analysis?
§ 60.6035 - What records must I keep for operator training and certification?
§ 60.6040 - What records must I keep for stack tests?
§ 60.6045 - What records must I keep for continuously monitored pollutants or parameters?
§ 60.6050 - What records must I keep for municipal waste combustors that use activated carbon?
REPORTING
§ 60.6055 - What reports must I submit before I submit my notice of construction?
§ 60.6060 - What must I include in my notice of construction?
§ 60.6065 - What reports must I submit after I submit my notice of construction and in what form?
§ 60.6070 - What are the appropriate units of measurement for reporting my data?
§ 60.6075 - When must I submit the initial performance test report?
§ 60.6080 - What must I include in my initial performance test report?
§ 60.6085 - When must I submit the annual report?
§ 60.6090 - What must I include in my annual report?
§ 60.6095 - What must I do if I am out of compliance with the requirements of this subpart?
§ 60.6100 - If a semiannual report is required, when must I submit it?
§ 60.6105 - What must I include in the semiannual out-of-compliance reports?
§ 60.6110 - Can reporting dates be changed?
AIR CURTAIN INCINERATORS THAT BURN 100 PERCENT WOOD WASTE, CLEAN LUMBER, AND/OR YARD WASTE
§ 60.6115 - What is an air curtain incinerator?
§ 60.6120 - What is yard waste?
§ 60.6125 -
§ 60.6130 - How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6135 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
EQUATIONS
§ 60.6140 - What equations must I use?
DEFINITIONS
§ 60.6145 - What definitions apply to this subpart?
Appendix - Table 1 to Subpart VVVV—Large Municipal Waste Combustor Carbon Monoxide Limits
Appendix - Table 2 to Subpart VVVV—Emission Limitations for New Large Municipal Waste Combustors
Appendix - Table 3 to Subpart VVVV of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
Appendix - Table 4 to Subpart VVVV—Performance Test Requirements for Compliance With Emissions Limits under § 60.5895