Report
| Due date
| Contents
| Reference
|
---|
1. Initial test report | a. No later than 60 days following the initial performance test | i. Complete test report for the initial performance test; and
ii. The values for the site-specific operating limits | § 60.3049.
§ 60.3049.
|
2. Waste management plan | a. No later than 60 days following the initial performance test | i. Reduction or separation of recyclable materials; and
ii. Identification of additional waste management measures and how they will be implemented | §§ 60.3010 through 60.3012.
§§ 60.3010 through 60.3012.
|
3. Annual Report | a. No later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report | i. Company Name and address;
ii. Statement and signature by the owner or operator;
iii. Date of report;
iv. Values for the operation limits;
v. If no deviations or malfunctions were reported, a statement that no deviations occurred during the reporting period; | §§ 60.3050 and 60.3051.
§§ 60.3050 and 60.3051.
§§ 60.3050 and 60.3051.
§§ 60.3050 and 60.3051.
§§ 60.3050 and 60.3051.
|
| | vi. Highest and lowest recorded 12-hour averages, as applicable, for carbon monoxide emissions and highest and lowest recorded 3-hour averages, as applicable, for each operating parameter recorded for the calendar year being reported; | §§ 60.3050 and 60.3051.
|
| | vii. Information for deviations or malfunctions recorded under § 60.3046(b)(6) and (c) through (e); | §§ 60.3050 and 60.3051.
|
| | viii. If a performance test was conducted during the reporting period, the results of the test; | §§ 60.3050 and 60.3051.
|
| | ix. If a performance test was not conducted during the reporting period, a statement that the requirements of § 60.3035(a) or (b) were met; and | §§ 60.3050 and 60.3051.
|
| | x. Documentation of periods when all qualified OSWI unit operators were unavailable for more than 12 hours but less than 2 weeks. | §§ 60.3050 and 60.3051.
|
| | xi. For each very small municipal waste combustion unit or institutional waste incineration unit for which you demonstrate continuous compliance according to § 60.3033(d), if no deviations from the percentages established for each waste category according to the waste profile required in § 60.3033(d)(1) and the OSWI unit has been operated within the operating parameter limits, a statement that there were no deviations from the waste profile percentage requirements and the OSWI unit has been operated within the operating parameter limits. | §§ 60.3050 and 60.3051.
|
4. Emission limitation or operating limit deviation report | a. By August 1 of that year for data collected during the first half of the calendar year. By February 1 of the following year for data collected during the second half of the calendar year | i. Dates and times of deviation;
ii. Averaged and recorded data for those dates;
iii. Duration and causes of each deviation and the corrective actions taken.
iv. Copy of operating limit monitoring data and any test reports; | §§ 60.3052 and 60.3053.
§§ 60.3052 and 60.3053.
§§ 60.3052 and 60.3053.
§§ 60.3052 and 60.3053.
|
| | v. Dates, times, and causes for monitor downtime incidents; | §§ 60.3052 and 60.3053.
|
| | vi. Whether each deviation occurred during a period of startup, shutdown, or malfunction; and | §§ 60.3052 and 60.3053.
|
| | vii. Dates, times, and duration of any bypass of the control device. | §§ 60.3052 and 60.3053.
|
5. Qualified operator deviation notification | a. Within 10 days of deviation | i. Statement of cause of deviation;
ii. Description of efforts to have an accessible qualified operator; and | § 60.3054(a)(1).
§ 60.3054(a)(1).
|
| | iii. The date a qualified operator will be accessible | § 60.3054(a)(1).
|
6. Qualified operation deviation status report | a. Every 4 weeks following deviation | i. Description of efforts to have an accessible qualified operator; | § 60.3054(a)(2).
|
| | ii. The date a qualified operator will be accessible; and | § 60.3054(a)(2).
|
| | iii. Request to continue operation. | § 60.3054(a)(2).
|
7. Qualified operator deviation notification of resumed operation | a. Prior to resuming operation | i. Notification that you are resuming operation. | § 60.3054(b).
|