REGULATIONS
Rulings
AD/CVD
Notices
HTSUS
U.S. Code
Regs
More
Ports
About
Updates
Apps
Larger font
Smaller font
SEARCH
Sort by Rank
Titles Ascending
Titles Descending
10 per page
25 Result/page
50 Result/page
Regulations last checked for updates: Sep 17, 2025
Title 40 - Protection of Environment last revised: Nov 17, 2025
All Titles
Title 40
Chapter I
Part 60
Subpart FFFF - Subpart FFFF—Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units
INTRODUCTION
§ 60.2980 - What is the purpose of this subpart?
§ 60.2981 - Am I affected by this subpart?
§ 60.2982 - Is a state plan required for all States?
§ 60.2983 - What must I include in my State plan?
§ 60.2984 - Is there an approval process for my State plan?
§ 60.2985 - What if my state plan is not approvable?
§ 60.2986 - Is there an approval process for a negative declaration letter?
§ 60.2987 - What compliance schedule must I include in my state plan?
§ 60.2988 - Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part?
§ 60.2989 - Does this subpart directly affect incineration unit owners and operators in my state?
§ 60.2990 - What Authorities are withheld by EPA?
APPLICABILITY OF STATE PLANS
§ 60.2991 - What incineration units must I address in my state plan?
§ 60.2992 - What is an existing incineration unit?
§ 60.2993 - Are any combustion units excluded from my state plan?
§ 60.2994 - Are air curtain incinerators regulated under this subpart?
MODEL RULE—USE OF MODEL RULE
§ 60.2996 - What is the purpose of the “model rule” in this subpart?
§ 60.2997 - How does the model rule relate to the required elements of my State plan?
§ 60.2998 - What are the principal components of the model rule?
MODEL RULE—COMPLIANCE SCHEDULE
§ 60.3000 - When must I comply?
§ 60.3001 - What must I do if I close my OSWI unit and then restart it?
§ 60.3002 - What must I do if I plan to permanently close my OSWI unit and not restart it?
§ 60.3003 - What else must I do prior to the compliance date if I meet the substitute means of compliance demonstration?
MODEL RULE—WASTE MANAGEMENT PLAN
§ 60.3010 - What is a waste management plan?
§ 60.3011 - When must I submit my waste management plan?
§ 60.3012 - What should I include in my waste management plan?
MODEL RULE—OPERATOR TRAINING AND QUALIFICATION
§ 60.3014 - What are the operator training and qualification requirements?
§ 60.3015 - When must the operator training course be completed?
§ 60.3016 - How do I obtain my operator qualification?
§ 60.3017 - How do I maintain my operator qualification?
§ 60.3018 - How do I renew my lapsed operator qualification?
§ 60.3019 - What site-specific documentation is required?
§ 60.3020 - What if all the qualified operators are temporarily not accessible?
MODEL RULE—EMISSION LIMITATIONS AND OPERATING LIMITS
§ 60.3022 - What emission limitations must I meet and by when?
§ 60.3023 - What operating limits must I meet and by when?
§ 60.3024 - What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
§ 60.3025 - [Reserved]
MODEL RULE—PERFORMANCE TESTING
§ 60.3027 - How do I conduct the initial and annual performance test?
§ 60.3028 - How are the performance test data used?
MODEL RULE—INITIAL COMPLIANCE REQUIREMENTS
§ 60.3030 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.3031 - By what date must I conduct the initial performance test?
§ 60.3032 - What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?
MODEL RULE—CONTINUOUS COMPLIANCE REQUIREMENTS
§ 60.3033 - How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.3034 - By what date must I conduct the annual performance test?
§ 60.3035 - May I conduct performance testing less often?
§ 60.3036 - May I conduct a repeat performance test to establish new operating limits?
MODEL RULE—MONITORING
§ 60.3038 - What continuous emission monitoring systems must I install?
§ 60.3039 - How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.3040 - What is my schedule for evaluating continuous emission monitoring systems?
§ 60.3041 - What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.3042 - How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.3043 - What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
§ 60.3044 - Is there a minimum amount of operating parameter monitoring data I must obtain?
MODEL RULE—RECORDKEEPING AND REPORTING
§ 60.3046 - What records must I keep?
§ 60.3047 - Where and in what format must I keep my records?
§ 60.3048 - What reports must I submit?
§ 60.3049 - What information must I submit following my initial performance test?
§ 60.3050 - When must I submit my annual report?
§ 60.3051 - What information must I include in my annual report?
§ 60.3052 - What other reports must I submit if I have a deviation?
§ 60.3053 - What must I include in the deviation report?
§ 60.3054 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.3055 - Are there any other notifications or reports that I must submit?
§ 60.3056 - In what form can I submit my reports?
§ 60.3057 - Can reporting dates be changed?
MODEL RULE—TITLE V OPERATING PERMITS
§ 60.3059 - Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.3060 - When must I submit a title V permit application for my existing unit?
MODEL RULE—TEMPORARY-USE INCINERATORS AND AIR CURTAIN INCINERATORS USED IN DISASTER RECOVERY
§ 60.3061 - What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
MODEL RULE—AIR CURTAIN INCINERATORS THAT BURN ONLY WOOD WASTE, CLEAN LUMBER, AND YARD WASTE
§ 60.3062 - What is an air curtain incinerator?
§ 60.3063 -
§ 60.3064 - What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it?
§ 60.3065 - What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it?
§ 60.3066 - What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3067 - How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3068 - What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3069 - [Reserved]
MODEL RULE—EQUATIONS
§ 60.3076 - What equations must I use?
MODEL RULE—DEFINITIONS
§ 60.3078 - What definitions must I know?
Appendix - Table 1 to Subpart FFFF of Part 60—Model Rule—Compliance Schedule
Appendix - Table 2 to Subpart FFFF of Part 60—Model Rule—Emission Limitations for That Apply to OSWI Units With Capacities Greater Than 10 Tons per Day
Appendix - Table 2a to Subpart FFFF of Part 60—Model Rule—Emission Limitations That Apply to OSWI Units With Capacities Less Than or Equal to 10 Tons per Day On or After [Date To Be Specified in State Plan] a
Appendix - Table 3 to Subpart FFFF of Part 60—Model Rule—Operating Limits for Incinerators
Appendix - Table 4 to Subpart FFFF of Part 60—Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
Appendix - Table 5 to Subpart FFFF of Part 60—Model Rule—Summary of Reporting Requirements
authority:
42 U.S.C. 7401
source:
36 FR 24877, Dec. 23, 1971, unless otherwise noted.
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
Get the CustomsMobile app!