Regulations last checked for updates: May 17, 2024

Title 48 - Federal Acquisition Regulations System last revised: May 14, 2024
208.7003-1 - 208.7003-1 Assignments under integrated materiel management (IMM).

(a) Acquire all items assigned for IMM from the IMM manager except—

(1) Items purchased under circumstances of unusual and compelling urgency as defined in FAR 6.302-2. After such a purchase is made, the requiring activity must send one copy of the contract and a statement of the emergency to the IMM manager;

(2) Items for which the IMM manager assigns a supply system code for local purchase or otherwise grants authority to purchase locally; or

(3) When purchase by the requiring activity is in the best interest of the Government in terms of the combination of quality, timeliness, and cost that best meets the requirement. This exception does not apply to items—

(i) Critical to the safe operation of a weapon system;

(ii) With special security characteristics; or

(iii) Which are dangerous (e.g., explosives, munitions).

(b) Follow the procedures at PGI 208.7003-1(b) when an item assigned for IMM is to be acquired by the requiring department in accordance with paragraph (a)(3) of this subsection.

[60 FR 61593, Nov. 30, 1995, as amended at 64 FR 51075, Sept. 21, 1999; 64 FR 61031, Nov. 9, 1999; 71 FR 39004, July 11, 2006]
authority: 41 U.S.C. 1303 and 48 CFR chapter 1
source: 56 FR 36306, July 31, 1991, unless otherwise noted.
cite as: 48 CFR 208.7003-1