Subpart CCCC - Subpart CCCC—Standards of Performance for Commercial and Industrial Solid Waste Incineration Units
INTRODUCTION
§ 60.2000 - What does this subpart do?
§ 60.2005 - When did this subpart become effective?
APPLICABILITY
§ 60.2010 - Does this subpart apply to my incineration unit?
§ 60.2015 - What is a new incineration unit?
§ 60.2020 - What combustion units are exempt from this subpart?
§ 60.2030 - Who implements and enforces this subpart?
§ 60.2035 - How are these new source performance standards structured?
§ 60.2040 - Do all eleven components of these new source performance standards apply at the same time?
PRECONSTRUCTION SITING ANALYSIS
§ 60.2045 - Who must prepare a siting analysis?
§ 60.2050 - What is a siting analysis?
WASTE MANAGEMENT PLAN
§ 60.2055 - What is a waste management plan?
§ 60.2060 - When must I submit my waste management plan?
§ 60.2065 - What should I include in my waste management plan?
OPERATOR TRAINING AND QUALIFICATION
§ 60.2070 - What are the operator training and qualification requirements?
§ 60.2075 - When must the operator training course be completed?
§ 60.2080 - How do I obtain my operator qualification?
§ 60.2085 - How do I maintain my operator qualification?
§ 60.2090 - How do I renew my lapsed operator qualification?
§ 60.2095 - What site-specific documentation is required?
§ 60.2100 - What if all the qualified operators are temporarily not accessible?
EMISSION LIMITATIONS AND OPERATING LIMITS
§ 60.2105 - What emission limitations must I meet and by when?
§ 60.2110 - What operating limits must I meet and by when?
§ 60.2115 - What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
PERFORMANCE TESTING
§ 60.2125 - How do I conduct the initial and annual performance test?
§ 60.2130 - How are the performance test data used?
INITIAL COMPLIANCE REQUIREMENTS
§ 60.2135 - How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2140 - By what date must I conduct the initial performance test?
§ 60.2141 - By what date must I conduct the initial air pollution control device inspection?
CONTINUOUS COMPLIANCE REQUIREMENTS
§ 60.2145 - How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2150 - By what date must I conduct the annual performance test?
§ 60.2151 - By what date must I conduct the annual air pollution control device inspection?
§ 60.2155 - May I conduct performance testing less often?
§ 60.2160 - May I conduct a repeat performance test to establish new operating limits?
MONITORING
§ 60.2165 - What monitoring equipment must I install and what parameters must I monitor?
§ 60.2170 - Is there a minimum amount of monitoring data I must obtain?
RECORDKEEPING AND REPORTING
§ 60.2175 - What records must I keep?
§ 60.2180 - Where and in what format must I keep my records?
§ 60.2185 - What reports must I submit?
§ 60.2190 - What must I submit prior to commencing construction?
§ 60.2195 - What information must I submit prior to initial startup?
§ 60.2200 - What information must I submit following my initial performance test?
§ 60.2205 - When must I submit my annual report?
§ 60.2210 - What information must I include in my annual report?
§ 60.2215 - What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2220 - What must I include in the deviation report?
§ 60.2225 - What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2230 - Are there any other notifications or reports that I must submit?
§ 60.2235 - In what form can I submit my reports?
§ 60.2240 - Can reporting dates be changed?
TITLE V OPERATING PERMITS
§ 60.2242 - Am I required to apply for and obtain a Title V operating permit for my unit?
AIR CURTAIN INCINERATORS (ACIS)
§ 60.2245 - What is an air curtain incinerator?
§ 60.2250 - What are the emission limitations for air curtain incinerators?
§ 60.2255 - How must I monitor opacity for air curtain incinerators?
§ 60.2260 - What are the recordkeeping and reporting requirements for air curtain incinerators?
DEFINITIONS
§ 60.2265 - What definitions must I know?
Appendix -
Appendix - Table 2 to Subpart CCCC of Part 60—Operating Limits for Wet Scrubbers
Appendix - Table 3 to Subpart CCCC of Part 60—Toxic Equivalency Factors
Appendix - Table 4 to Subpart CCCC of Part 60—Summary of Reporting Requirements 1
Appendix - Table 5 to Subpart CCCC of Part 60—Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Appendix - Table 6 to Subpart CCCC of Part 60—Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Appendix - Table 7 to Subpart CCCC of Part 60—Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
Appendix - Table 8 to Subpart CCCC of Part 60—Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013