Appendix - Table 9 to Subpart VVVVVV of Part 63—Applicability of General Provisions to Subpart VVVVVV

As required in § 63.11501(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.

Citation Subject Applies to Subpart VVVVVV? Explanation
63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e)ApplicabilityYes
63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d)ReservedNo
63.2DefinitionsYes
63.3Units and AbbreviationsYes
63.4Prohibited Activities and CircumventionYes
63.5Preconstruction Review and Notification RequirementsYes
63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (g), (i), (j)Compliance with Standards and Maintenance RequirementsYes
63.6(b)(6), (c)(3), (c)(4), (d), (h)(3), (h)(5)(iv)ReservedNo
63.6(e)(1)(i) and (ii), (e)(3), and (f)(1)SSM RequirementsNoSee § 63.11495(d) for general duty requirement.
63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9)NoSubpart VVVVVV does not include opacity or visible emissions (VE) standards or require a continuous opacity monitoring system (COMS).
63.7(a)(1), (a)(3), (a)(4), (c), (e)(4), and (f)-(h)Performance Testing RequirementsYes
63.7(a)(2), (b), (d), (e)(2)-(e)(3)Performance Testing Schedule, Notification of Performance Test, Performance Testing Facilities, and Conduct of Performance TestsYes/NoRequirements apply if conducting test for metal HAP control; requirements in §§ 63.997(c)(1), (d), (e), and 63.999(a)(1) apply, as referenced in § 63.11496(g), if conducting test for organic HAP or hydrogen halide and halogen HAP control device.
63.7(e)(1)Performance TestingNoSee § 63.11496(f)(3)(ii) if conducting a test for metal HAP emissions. See §§ 63.11496(g) and 63.997(e)(1) if conducting a test for continuous process vents or for hydrogen halide and halogen emissions. See §§ 63.11496(g) and 63.2460(c) if conducting a test for batch process vents.
63.8(a)(1), (a)(4), (b), (c)(1)(ii), (c)(2)-(c)(3), (f)(1)-(5)Monitoring RequirementsYes
63.8(a)(2)Monitoring RequirementsNo
63.8(a)(3)ReservedNo
63.8(c)(1)(i)General Duty to Minimize Emissions and CMS OperationNo
63.8(c)(1)(iii)Requirement to Develop SSM Plan for CMSNo
63.8(c)(4)YesOnly for CEMS. CPMS requirements in 40 CFR part 63, subpart SS are referenced from § 63.11496. Requirements for COMS do not apply because subpart VVVVVV does not require COMS.
63.8(c)(5)NoSubpart VVVVVV does not require COMS.
63.8(c)(6)-(c)(8), (d)(1)-(d)(2), (e), (f)(6)YesRequirements apply only if you use a continuous emission monitoring system (CEMS) to demonstrate compliance with the alternative standard in § 63.11496(e).
63.8(d)(3)Written Procedures for CMSYesRequirement applies except for last sentence, which refers to an SSM plan. SSM plans are not required.
63.8(g)(1)-(g)(4)YesData reduction requirements apply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e). COMS requirements do not apply. Requirement in § 63.8(g)(2) does not apply because data reduction for CEMS are specified in 40 CFR part 63, subpart FFFF.
63.8(g)(5)NoData reduction requirements for CEMS are specified in § 63.2450(j)(4), as referenced from § 63.11496. CPMS requirements are specified in 40 CFR part 63, subpart SS, as referenced from § 63.11496.
63.9(a), (b)(1), (b)(2), (b)(4), (b)(5), (c), (d), (e), (i)Notification RequirementsYes
63.9(b)(3), (h)(4)ReservedNo
63.9(f)NoSubpart VVVVVV does not contain opacity or VE limits.
63.9(g)YesAdditional notification requirement applies only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
63.9(h)(1)-(h)(3), (h)(5)-(h)(6)YesExcept subpart VVVVVV does not contain opacity or VE limits.
63.9(i)Yes
63.9(j)Change in Information Already ProvidedNoNotification of process changes that affect a compliance determination are required in § 63.11501(d)(4).
63.10(a)Recordkeeping RequirementsYes
63.10(b)(1)Yes
63.10(b)(2)(i)Recordkeeping of Occurrence and Duration of Startups and ShutdownsNoSee § 63.11501(c)(8) for recordkeeping of occurrence and duration of each startup and shutdown for continuous process vents that are subpart to Table 3 to this subpart.
63.10(b)(2)(ii)Recordkeeping of MalfunctionsNoSee § 63.11501(c)(1)(vii) and (viii) for recordkeeping of (1) date, time, duration, and volume of excess emissions and (2) actions taken during malfunction.
63.10(b)(2)(iii)Maintenance RecordsYes
63.10(b)(2)(iv) and (v)Actions Taken to Minimize Emissions During SSMNo
63.10(b)(2)(vi), (x), (xi), (xiii)YesApply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
63.10(b)(2)(vii)-(b)(2)(ix), (b)(2)(xii), (b)(2)(xiv)Yes
63.10(b)(3)Yes
63.10(c)(1), (c)(5)-(c)(6), (c)(13)-(c)(14)YesApply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
63.10(c)(7)-(8)Additional Recordkeeping Requirements for CMS—Identifying Exceedances and Excess EmissionsYes
63.10(c)(10)Recordkeeping Nature and Cause of MalfunctionsNoSee § 63.11501(c)(1)(vii) and (viii) for malfunctions recordkeeping requirements.
63.10(c)(11)Recording Corrective ActionsNoSee § 63.11501(c)(1)(vii) and (viii) for malfunctions recordkeeping requirements.
63.10(c)(12)Yes
63.10(c)(15)Use of SSM PlanNo
63.10(c)(2)-(c)(4), (c)(9)ReservedNo
63.10(d)(1), (d)(2), (d)(4), (e)(1), (e)(2), (f)Reporting RequirementsYes
63.10(d)(3)NoSubpart VVVVVV does not include opacity or VE limits.
63.10(d)(5)SSM ReportsNoSee § 63.11501(d)(8) for reporting requirements for malfunctions.
63.10(e)(1)-(e)(2)YesApply only if you use CEMS to demonstrate compliance with alternative standard in § 63.11496(e).
63.10(e)(3)Yes
63.10(e)(4)NoSubpart VVVVVV does not include opacity or VE limits.
63.11Control Device RequirementsYes
63.12State Authorities and DelegationsYes
63.13AddressesYes
63.14Incorporations by ReferenceYes
63.15Availability of Information and ConfidentialityYes
63.16Performance Track ProvisionsYes
[74 FR 56041, Oct. 29, 2009, as amended at 77 FR 75762, Dec. 21, 2012]
authority: 42 U.S.C. 7401
source: 57 FR 61992, Dec. 29, 1992, unless otherwise noted.