Regulations last checked for updates: May 16, 2024

Title 34 - Education last revised: Apr 29, 2024
§ 75.605 - Beginning the construction.

(a) A grantee shall begin work on construction within a reasonable time after the grant for the construction is made.

(b) Before construction is advertised or placed on the market for bidding, the grantee shall get approval by the Secretary of the final working drawings and specifications.

(Authority: 20 U.S.C. 1221e-3 and 3474)
authority: 20 U.S.C. 1221e-3 and 3474; E.O. 13279, 67 FR 77141, 3 CFR, 2002 Comp., p. 258; E.O. 13559, 75 FR 71319, 3 CFR, 2010 Comp., p. 273; and E.O. 13831, 83 FR 20715, 3 CFR, 2018 Comp., p. 806, unless otherwise noted
source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.
cite as: 34 CFR 75.605