REGULATIONS
  • Rulings
  • AD/CVD
  • Notices
  • HTSUS
  • U.S. Code
  • Regs
  • More
    • Ports
    • About
    • Updates
    • Apps
    • Larger font
    • Smaller font
Regulations last checked for updates: Jan 12, 2026

Title 10 - Energy last revised: Jan 08, 2026
All TitlesTitle 10Chapter IPart 60Subpart E - Subpart E—Technical Criteria

PERFORMANCE OBJECTIVES
  • § 60.111 - Performance of the geologic repository operations area through permanent closure.
  • § 60.112 - Overall system performance objective for the geologic repository after permanent closure.
  • § 60.113 - Performance of particular barriers after permanent closure.
  • § 60.101 - Purpose and nature of findings.
  • § 60.102 - Concepts.

LAND OWNERSHIP AND CONTROL
  • § 60.121 - Requirements for ownership and control of interests in land.

SITING CRITERIA
  • § 60.122 - Siting criteria.

DESIGN CRITERIA FOR THE GEOLOGIC REPOSITORY OPERATIONS AREA
  • § 60.130 - General considerations.
  • § 60.131 - General design criteria for the geologic repository operations area.
  • § 60.132 - Additional design criteria for surface facilities in the geologic repository operations area.
  • § 60.133 - Additional design criteria for the underground facility.
  • § 60.134 - Design of seals for shafts and boreholes.

DESIGN CRITERIA FOR THE WASTE PACKAGE
  • § 60.135 - Criteria for the waste package and its components.

PRECLOSURE CONTROLLED AREA
  • § 60.136 - Preclosure controlled area.

PERFORMANCE CONFIRMATION REQUIREMENTS
  • § 60.137 - General requirements for performance confirmation.
source: 46 FR 13980, Feb. 25, 1981, unless otherwise noted.
.list_box li,p,.cm-search-info,.cm-search-detail,.abt span,.expand-collapse_top
© 2014 CustomsMobile | Disclaimer | Privacy | About
Get the CustomsMobile app!