• To : Partner Government Agencies
Subject: ACE PRODUCTION OUTAGE, Saturday, Sept 24, 2016 @ 2200 to 0400 ET Sunday, Sept 25
Please be advised that there will be an ACE PRODUCTION outage Saturday evening, September 24, 
2016 starting 2200 ET and ending Sunday, September 25, 2016 at 0400 ET.

ACE O&M (ACE Manifest, ACE Portal, ACE Accounts, ACE Reports) will perform infrastructure maintenance activities, and the following ACE Deployment will take place during this time:

PGA (on ACE Entry Summary)
--------------------------
•   PGAD-12638 Fix for Redelivery Request via ACE's PGA GUI failed to complete successfully

•   PGAD-12635 Miscellaneous Bug fixes:

    o	An NMFS yellow fin tuna embargo (PE7 error) should not occur unless specific conditions are met:
	- PE7 should only trigger when the vessel is registered in one of the 9 embargoed countries AND if the yellow fin tuna was caught in the eastern tropical pacific ocean AND if purse seine gear was used.

    o	CA90 Narrative Message Text began in the wrong position.
	The narrative in the CA90 should be at positions 10-49, but in a reported entry the narrative began in position 13.