Regulations last checked for updates: Feb 12, 2026

Title 49 - Transportation last revised: Feb 03, 2026
§ 190.401 - Scope.

If PHMSA conducts a facility design and/or construction safety review or inspection in connection with a proposal to construct, expand, or operate a gas, hazardous liquid or carbon dioxide pipeline facility, or a liquefied natural gas facility that meets the applicability requirements in § 190.403, PHMSA may require the applicant proposing the project to pay the costs incurred by PHMSA relating to such review, including the cost of design and construction safety reviews or inspections.

source: 45 FR 20413, Mar. 27, 1980, unless otherwise noted.
cite as: 49 CFR 190.401