Regulations last checked for updates: May 18, 2024

Title 48 - Federal Acquisition Regulations System last revised: May 14, 2024
836.521 - 836.521 Specifications and drawings for construction.

The contracting officer shall insert the clause at 852.236-71, Specifications and Drawings for Construction, in solicitations and contracts for construction that include the FAR clause at 52.236-21, Specifications and Drawings for Construction.

[84 FR 9972, Mar. 19, 2019]
authority: 40 U.S.C. 121(c); 41 U.S.C. 1121(c)(3), 1303(a)(2) and 1702; and 48 CFR 1.301-1.304
source: 73 FR 2717, Jan. 15, 2008, unless otherwise noted.
cite as: 48 CFR 836.521