Regulations last checked for updates: Dec 19, 2025

Title 48 - Federal Acquisition Regulations System last revised: Dec 02, 2025
49.105-4 - 49.105-4 Cleanup of construction site.

In the case of terminated construction contracts, the contracting officer shall direct action to ensure the cleanup of the site, protection of serviceable materials, removal of hazards, and other action necessary to leave a safe and healthful site.

authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 4 and 10 U.S.C. chapter 137 legacy provisions (see 10 U.S.C. 3016); and 51 U.S.C. 20113.
source: 48 FR 42447, Sept. 19, 1983, unless otherwise noted.
cite as: 48 CFR 49.105-4