30.202-8 - 30.202-8 Subcontractor disclosure statements.

(a) When the Government requires determinations of adequacy of subcontractor disclosure statements, the CFAO for the subcontractor shall provide this determination to the CFAO for the contractor or next higher-tier subcontractor. The higher-tier CFAO shall not change the determination of the lower-tier CFAO.

(b) Any determination that it is impractical to secure a subcontractor's Disclosure Statement must be made in accordance with 48 CFR 9903.202-2.

[57 FR 39587, Aug. 31, 1992, as amended at 61 FR 18918, Apr. 29, 1996; 62 FR 40237, July 25, 1997; 70 FR 11753, Mar. 9, 2005; 85 FR 67615, Oct. 23, 2020]
authority: 40 U.S.C. 121(c); 10 U.S.C. chapter 4 and 10 U.S.C. chapter 137 legacy provisions (see 10 U.S.C. 3016); and 51 U.S.C. 20113.
source: 57 FR 39587, Aug. 31, 1992, unless otherwise noted.