Regulations last checked for updates: Feb 06, 2026

Title 48 - Federal Acquisition Regulations System last revised: Jan 28, 2026
15.508 - 15.508 Discovery of mistakes.

Mistakes in a contractor's proposal that are disclosed after award shall be processed substantially in accordance with the procedures for mistakes in bids at 14.407-4.

authority: 41 U.S.C. 1121(b); 40 U.S.C. 121(c); 10 U.S.C. chapter 4 and 10 U.S.C. chapter 137 legacy provisions (see 10 U.S.C. 3016); and 51 U.S.C. 20113.
source: 62 FR 51230, Sept. 30, 1997, unless otherwise noted.
cite as: 48 CFR 15.508