The Director calculates revised base rates for each area by dividing the initial base rate (from Step 7) by the average weighting factor (from Step 8) to produce a revised base rate for each area.
[USCG-2016-0268, 82 FR 41496, Aug. 31, 2017]
source: USCG-2015-0497, 81 FR 11941, Mar. 7, 2016, unless otherwise noted.
cite as: 46 CFR 404.109