If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.
source: CGD 74-125A, 47 FR 15267, Apr. 8, 1982, unless otherwise noted.
cite as: 46 CFR 112.15-10