Each safety valve for a drum, superheater, or reheater of a boiler must be tested at the interval specified by table 1 to § 61.05-10.
[CGD 95-028, 62 FR 51202, Sept. 30, 1997]
source: CGFR 68-82, 33 FR 18890, Dec. 18, 1968, unless otherwise noted.
cite as: 46 CFR 61.05-20