Regulations last checked for updates: Apr 29, 2024

Title 40 - Protection of Environment last revised: Jun 26, 2024
§ 45.150 - Reports.

(a) Recipients must submit the reports required in 2 CFR 200.328 and 200.329.

(b) A draft of the final project report is required 90 days before the end of the project period. The recipient shall prepare the final projects report in accordance with the project officer's instructions and submit the final project report within 120 days after the end of the project period as provided in 2 CFR 200.344.

[87 FR 30402, May 19, 2022]
authority: Sec. 103 of the Clean Air Act, as amended (42 U.S.C. 7403), secs. 104(g), 109, and 111 of the Clean Water Act, as amended (33 U.S.C. 1254(g), 1259, and 1261), secs. 7007 and 8001 of the Solid Waste Disposal Act, as amended (42 U.S.C. 6977 and 6981); sec. 1442 of the Safe Drinking Water Act, as amended (42 U.S.C. 300j-1). 2 CFR 200
source: 49 FR 41004, Oct. 18, 1984, unless otherwise noted.
cite as: 40 CFR 45.150