§ 192.03 - Monitoring.

A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02, and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c).

[60 FR 2866, Jan. 11, 1995]
authority: Sec. 275 of the Atomic Energy Act of 1954, 42 U.S.C. 2022,as,Pub. L. 95-604, as amended
source: 48 FR 602, Jan. 5, 1983, unless otherwise noted.