A grantee may incur pre-award costs as specified in 2 CFR 200.308(d)(1) unless—
(a) The Department regulations other than 2 CFR part 200 or a statute prohibit these costs; or
(b) The conditions of the award prohibit these costs.
[80 FR 67264, Nov. 2, 2015, as amended at 89 FR 70329, Aug. 29, 2024]
source: 45 FR 22497, Apr. 3, 1980, unless otherwise noted. Redesignated at 45 FR 77368, Nov. 21, 1980.
cite as: 34 CFR 75.263