Regulations last checked for updates: Feb 09, 2026

Title 33 - Navigation and Navigable Waters last revised: Feb 03, 2026
§ 118.25 - Application procedure.

Approval of lights and other signals required shall be obtained, prior to construction, from the District Commander of the area in which the structure will be situated. Application shall be by letter accompanied by duplicate sets of drawings showing (a) plan and elevation of the structure showing lights and signals proposed, and (b) small scale vicinity chart showing proposed bridge and all other bridges within 1,000 feet above or below the proposed bridge.

authority: 33 U.S.C. 494; 14 U.S.C. 503,544; DHS Security Delegation No. 00170.1, Revision No. 01.4
source: CGD 75-046, 40 FR 24898, June 11, 1975, unless otherwise noted.
cite as: 33 CFR 118.25