The draw of the Norfolk Southern Railroad Bridge, mile 3.5, is remotely operated, and is required, in addition to the other signals, to operate a radiotelephone and telephone and shall open on signal; except from October 31 through March 31 when it will open on signal if provided a 12-hours advance notice of arrival.
[USCG-2023-0185, 90 FR 13414, Mar. 24, 2025]
source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
cite as: 33 CFR 117.853