The draw of the S82 bridge, mile 6.3, in Cameron Parish shall open on signal if at least 8 hours notice is given. Public vessels of the United States and vessels in distress shall be passed as soon as possible.
[CGD08-94-029, 60 FR 4561, Jan. 24, 1995]
source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
cite as: 33 CFR 117.495