Regulations last checked for updates: May 03, 2024

Title 30 - Mineral Resources last revised: Apr 24, 2024
§ 817.122 - Subsidence control: Public notice.

At least 6 months prior to mining, or within that period if approved by the regulatory authority, the underground mine operator shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the operator's subsidence control plan may be examined.

[48 FR 24652, June 1, 1983, as amended at 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]
authority: 30 U.S.C. 1201
source: 44 FR 15422, Mar. 13, 1979, unless otherwise noted.
cite as: 30 CFR 817.122