Regulations last checked for updates: May 19, 2024

Title 30 - Mineral Resources last revised: May 15, 2024
§ 57.12017 - Work on power circuits.

Power circuits shall be deenergized before work is done on such circuits unless hot-line tools are used. Suitable warning signs shall be posted by the individuals who are to do the work. Switches shall be locked out or other measures taken which shall prevent the power circuits from being energized without the knowledge of the individuals working on them. Such locks, signs, or preventive devices shall be removed only by the person who installed them or by authorized personnel.

authority: 30 U.S.C. 811.
source: 50 FR 4082, Jan. 29, 1985, unless otherwise noted.
cite as: 30 CFR 57.12017