Table 1 to this section indicates the applicability, by location and type of action, of the decision making process for implementing Executive Order 11988 and Executive Order 11990 under this subpart.
Type of proposed action
(new reviewable action or an amendment)
1
| Floodways
| Coastal high hazard and LiMWA areas
| Wetlands or FFRMS
floodplain outside coastal high hazard area, LiMWA area, and floodways
|
---|
Critical actions as defined in § 55.2(b)(3) | Critical actions not allowed unless they meet the requirements for critical actions in § 55.8 and are processed under § 55.20
2 | Critical actions not allowed unless they meet the requirements for critical actions in § 55.8 and are processed under § 55.20
2 | Allowed if the proposed critical action is processed under § 55.20.
2
|
Noncritical actions not excluded under § 55.12 or § 55.13 | Allowed only if the proposed non-critical action is not prohibited under § 55.8(a)(1) and is processed under § 55.20
2 | Allowed only if the proposed noncritical action is processed under § 55.20
2 and is (1) a functionally dependent use, (2) existing construction (including improvements), or (3) reconstruction following destruction caused by a disaster. If the action is not a functionally dependent use, the action must be designed for location in a coastal high hazard area under § 55.8(a)(3) | Allowed if proposed noncritical action is processed under § 55.20.
2
|
[89 FR 30910, Apr. 23, 2024]
source: 59 FR 19107, Apr. 21, 1994, unless otherwise noted.
cite as: 24 CFR 55.16