(a) Yes, costs associated with approach roadway work, as defined in § 661.5 are eligible.
(b) Long approach fills, causeways, connecting roadways, interchanges, ramps, and other extensive earth structures, when constructed beyond an attainable touchdown point, are not eligible uses of IRRBP funds.
authority: 23 U.S.C. 120(j) and (k), 202, and 315; Section 1119 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA–LU) (Pub. L. 109–59, 119 Stat. 1144); and
49 CFR 1.48
source: 73 FR 15664, Mar. 25, 2008, unless otherwise noted.
cite as: 23 CFR 661.51