(a) This section identifies the original “Air Implementation Plan for the State of Wyoming” and all revisions submitted by Wyoming that were federally approved prior to August 31, 2006.
(b) The plan was officially submitted on January 26, 1972.
(c) The plan revisions listed below were submitted on the dates specified.
(1) Compliance schedule information in three plants submitted March 28, 1972, by the Department of Health and Social Services (DHSS). (Non-regulatory.)
(2) Procedural clarification to emergency episodes plan submitted May 3, 1972, by DHSS.
(3) Particulate compliance schedules submitted February 9, 1973, by DHSS.
(4) Emergency episode plan submitted February 27, 1973, by DHSS. (Non-regulatory).
(5) Compliance schedules submitted on March 1, 1973, by DHSS.
(6) Revision of Wyoming's Standards and Regulations (Chapter I, Section 1-20) submitted April 18, 1973, by DHSS.
(7) Revision of particulate control strategy to require compliance with particulate standards not later than January 31, 1974, except where approved by EPA and compliance schedule portions of the plan submitted May 29, 1973, by DHSS.
(8) Compliance schedule revisions, legal authority additions, update of Wyoming's Air Quality Standards and Regulations, non-regulatory source surveillance and new source review procedures submitted on August 7, 1974, by the Governor.
(9) Legal authority additions and compliance schedule revisions submitted on February 19, 1976, by the Governor.
(10) Requirements for continuous opacity monitoring by all fossil fuel fired steam generators with heat inputs in excess of 250 million Btu per hour and other miscellaneous revisions to the State regulations as submitted by the Air Quality Division (AQD) on May 9, 1978.
(11) Provisions to meet the requirements of Parts C and D and sections 110, 126, and 127 of the Clean Air Act, as amended in 1977 were submitted on January 26, 1979.
(12) A revision to Section 14 of the Wyoming Air Quality Standards and Regulations was submitted on July 18, 1980, and October 27, 1980.
(13) On August 26, 1981 and August 27, 1981, Wyoming submitted revisions to the requirements for Prevention of Significant Deterioration, the Air Quality Monitoring Plan, revisions to the Emergency Episode Contingency Plan, and revisions to stationary source permitting regulations.
(14) Revisions to the new source permit requirements in Sections 21 and 24 of the Wyoming regulations were submitted on April 30, 1981, and February 8, 1982.
(15) On August 30, 1984, the State of Wyoming submitted a plan revision for lead.
(16) Revisions to the new source permit requirements in sections 21 and 24 of the Wyoming regulation for visibility protection were submitted on April 12, 1985.
(i) Incorporation by reference.
(A) Letter from Randolph Wood, Administrator, Wyoming Air Quality Division, dated April 12, 1985, submitting the Wyoming Visibility SIP and Regulations.
(B)(1) Wyoming Air Quality Standards and Regulations (WAQSR), Section 21.n. (1) and (2) adopted on January 22, 1985.
(2) WAQSR, Section 24.b.(1)(f) adopted on January 22, 1985.
(3) WAQSR, Section 24.b.(6) (a) and (b) revised and adopted on January 22, 1985.
(17) A revision to the SIP was submitted by the Administrator of the Wyoming Air Quality Division on September 6, 1988, for visibility general plan requirements, monitoring, and long-term strategies.
(i) Incorporation by reference.
(A) Letter dated September 6, 1988, Charles A. Collins, Administrator of the Wyoming Air Quality Division, submitting a SIP revision for visibility protection.
(B) The SIP revision for visibility protection, “Section 28 Visibility” of the Wyoming Air Quality Standards and Regulations, and “Wyoming State Implementation Plan for Class I Visibility Protection” was adopted by the Wyoming Environmental Quality Council on March 23, 1988, and became effective on May 10, 1988.
(18) On September 6, 1988, the Administrator of the Air Quality Division, as the Governor's designee, submitted a plan revising the stack height regulations, Wyoming Air Quality Standards and Regulations (WAQSR) section 21(d).
(i) Incorporation by reference.
(A) Revisions to the Wyoming Air Quality Standards and Regulation section 21(d), stack heights, were adopted and effective on May 10, 1988.
(19) In a letter dated August 5, 1986, the Administrator of the Air Quality Division of Wyoming, submitted the stack height demonstration analysis. EPA is approving the demonstration analysis for all of the stacks.
(i) Incorporation by reference.
(A) Stack height demonstration analysis submitted by the State in a letter dated August 5, 1986.
(20) A revision to the SIP was submitted by the Administrator of the Wyoming Air Quality Division on March 14, 1989, to address the Group III PM-10 SIP requirements and Group II PM-10 SIP requirements for Lander, Wyoming.
(i) Incorporation by reference.
(A) Amendments to the Wyoming Air Quality Standards and Regulations: section 2 (Definitions) (a)(xxx), section 3 (Ambient Standards for Particulate Matter) (a), section 20 (Air Pollution Emergency Episodes) (b)(ii), section 21 (Permit Requirements for Construction, Modification, and Operation) (c)(ii) and section 24 (Prevention of Significant Deterioration) (a)(xx)(A), (b)(i)(E)(VI)(1.)(c.)(f.)(h.) & (1.), (b)(iii), (b)(iv), (b)(viii), and (b)(xii)(D)(E)(F) & (G), effective February 13, 1989.
(B) March 14, 1989 letter from Charles A. Collins, Administrator of the Wyoming Air Quality Division to James J. Scherer, EPA Region VIII Regional Administrator, identifying the effective date of the above regulation amendments.
(21) On November 20, 1990, the Governor of Wyoming submitted revisions to the plan. The revisions include amendments to the prevention of significant deterioration of air quality (PSD) regulations to incorporate the nitrogen dioxide (NO2) increments, revisions to the new source review requirements and PSD regulations to make them federally enforceable, and revisions to the PSD regulations to allow establishment of multiple baseline areas which may have different baseline dates and different baseline concentrations.
(i) Incorporation by reference.
(A) Revisions to the Wyoming Air Quality Standards and Regulations, Section 2, Definitions, Section 21, Permit Requirements for Construction, Modification, and Operation, and Section 24, Prevention of Significant Deterioration, effective October 30, 1990.
(ii) Additional material.
(A) November 5, 1990, letter from Douglas Skie, EPA, to Charles A. Collins, Administrator, Air Quality Division, Wyoming Department of Environmental Quality.
(22) On September 6, 1988, the Governor of Wyoming submitted revisions to Section 3 of the Wyoming Air Quality Standards and Regulations, adding subsection (d) which defines “ambient air” for surface coal mines located in Wyoming's Powder River Basin.
(i) Incorporation by reference.
(A) Revisions to Section 3(d) of the Wyoming Air Quality Standards and Regulations, effective June 5, 1987.
(ii) Additional material.
(A) Memorandum of Agreement signed on December 22, 1993 by Dennis Hemmer, Director, Department of Environmental Quality, State of Wyoming, and on January 24, 1994 by Patricia D. Hull, Director, Air, Radiation and Toxics Division, EPA Region VIII.
(23) On November 1, 1993, the Governor of Wyoming submitted a plan for the establishment and implementation of a Small Business Assistance Program to be incorporated into the Wyoming State Implementation Plan as required by section 507 of the Clean air Act.
(i) Incorporation by reference.
(A) November 1, 1993, letter from the Governor of Wyoming submitting a Small Business Assistance Program plan to EPA.
(B) The State of Wyoming plan for the establishment and implementation of a Small Business Assistance Program, adopted September 16, 1993, by the Wyoming Environmental Quality Council.
(24) On August 28, 1989, the Governor of Wyoming submitted revisions to the Wyoming State implementation plan (SIP) for Sheridan, Wyoming. In addition to the original August 28 submittal, eight submittals containing information in response to EPA requests and to the new Clean Air Act Amendments were submitted. The August 28, 1989, submittal, in combination with the eight subsequent submittals, satisfy those moderate PM10 nonattainment SIP requirements due on November 15, 1991. Included in the August 28, 1989, submittal were PM10 contingency measures for Sheridan to satisfy the requirements of section 172(c)(9) of the Act that were due by November 15, 1993.
(i) Incorporation by reference.
(A) “The City of Sheridan, Air Quality Maintenance Plan,” including the Street Winter Maintenance Plan and the contingency plan calling for the use of deicing chemicals on downtown streets, adopted on February 21, 1989.
(ii) Additional material.
(A) Letter dated November 21, 1989, from the Wyoming Department of Environmental Quality to EPA which includes a memorandum dated November 15, 1989 from the Wyoming Attorney General's Office to the Wyoming Department of Environmental Quality; the memorandum includes Wyoming Statute 35-11-201.
(25) On November 12, 1993, the Governor of Wyoming submitted revisions to the Wyoming State Implementation Plan (SIP). Specifically, the State submitted revisions to the Wyoming Air Quality Standards and Regulations (WAQSR), section 21 “Permit requirements for construction, modification and operation.” Among other things, these revisions were made to address the non-attainment New Source Review (NSR) provisions of part D of the Act for PM10 nonattainment areas, which were due to EPA on June 30, 1992.
(i) Incorporation by reference.
(A) The following subsections of section 21 of the Wyoming Air Quality Standards and Regulations “Permit requirements for construction, modification and operation,” adopted on September 16, 1993 and effective October 26, 1993: subsections (a)(ii), (a)(iii), (a)(v), (c)(ii)(B), (k)(vii) and (o).
(ii) Additional material.
(A) Letter from Mary A. Throne, Assistant Attorney General, to the Governor of Wyoming, dated October 1, 1993, documenting the necessary legal authority under state law to adopt and implement the revised regulation.
(26) On March 14, 1995, the Governor of Wyoming submitted revisions to the prevention of significant deterioration permitting regulations in Section 24 of the Wyoming Air Quality Standards to incorporate changes in the Federal PSD permitting regulations for utility pollution control projects, PM-10 increments, and to make other minor changes.
(i) Incorporation by reference.
(A) Revisions to Section 24 of the Wyoming Air Quality Standards, subsections (a)(ix)(B), (a)(x)(H)-(K), (a)(xii)(D), (a)(xv), (a)(xix)(D) and (E), (a)(xxviii)-(xxxv), (b)(i)(A)(I), (b)(i)(E)(VI)(1), (b)(viii), and (b)(xii)(I), effective 2/13/95.
(27) On September 15, 1982, the Administrator of the Wyoming Air Quality Division submitted clarifications and revisions to the particulate matter control requirements of Section 25 of the Wyoming Air Quality Standards and Regulations (WAQSR) for FMC Corporation in the Trona Industrial Area. In addition, on May 16, 1985, the Administrator of the Wyoming Air Quality Division submitted revisions to the construction permitting requirements in Section 21 of the WAQSR to specify guidelines for best available control technology for new large mining operations. The Governor of Wyoming submitted revisions to Section 21 of the WAQSR, “Permit requirements for construction, modification, and operation,” on November 12, 1993. Last, the Governor of Wyoming submitted revisions to Section 24 of the WAQSR, “Prevention of Significant Deterioration,” on March 14, 1995.
(i) Incorporation by reference.
(A) Revisions to Section 25 of the WAQSR, “Sweetwater County Non-Attainment Area Particulate Matter Regulations,” subsection c.(2), effective September 13, 1982.
(B) Revisions to Section 21 of the WAQSR, “Permit requirements for construction, modification, and operation,” subsection c.(5), effective May 10, 1985.
(C) Revisions to Section 21 of the WAQSR, “Permit requirements for construction, modification, and operation,” subsection (a)(iv), effective October 26, 1993.
(D) Revisions to Section 24 of the WAQSR, “Prevention of Significant Deterioration,” subsections (a)(xix), (b)(iv), and (b)(xii)(H), effective February 13, 1995.
(28) On March 14, 1995, the Governor of Wyoming submitted revisions to the SIP that incorporate the General Conformity requirements of 40 CFR part 93, Subpart B into State regulation.
(i) Incorporation by reference.
(A) Section 32 of the Wyoming Air Quality Standards, “Conformity of General Federal Actions to State Implementation Plans,” effective February 13, 1995.
(29) The Governor of Wyoming submitted revisions to sections 2, 4, 5, 8, 9, 10, 14, and 21 of the Wyoming Air Quality Standards and Regulations (WAQSR) on May 21, 1999.
(i) Incorporation by reference.
(A) Revisions to the WAQSR, section 2 Definitions, subsection 2(a)(xxx)(B) excluding the words “or an equivalent or alternative method approved by the Administrator,” effective October 15, 1998.
(B) Revisions to the WAQSR, section 4 Sulfur oxides, subsection 4(h) excluding the words “or an equivalent method,” effective October 15, 1998.
(C) Revisions to the WAQSR, section 5 Sulfuric acid mist excluding the words “or an equivalent method,” effective October 15, 1998.
(D) Revisions to the WAQSR, section 8 Ozone, effective October 15, 1998.
(E) Revisions to the WAQSR, section 9 Volatile organic compounds, effective October 15, 1998.
(F) Revisions to the WAQSR, section 10 Nitrogen oxides, subsections 10(b), 10(b)(vii), 10(b)(viii), and 10(b)(ix), excluding the words “or by an equivalent method” in subsection 10(b), effective October 15, 1998.
(G) Revisions to the WAQSR, section 14 Control of particulate emissions, subsection 14(h)(iv) excluding the sentence, “Provided that the Administrator may require that variations to said methods be included or that entirely different methods be utilized if he determines that such variations or different methods are necessary in order for the test data to reflect the actual emission rate of particulate matter,” effective October 15, 1998.
(H) Revisions to the WAQSR, section 21 Permit requirements for construction, modification and operation, subsections 21(a)(vi) and 21(h), effective October 15, 1998.
(ii) Additional material.
(A) September 1, 1998 letter from Dan Olson, Administrator, Wyoming Air Quality Division, to Richard R. Long, Director, Air and Radiation Program, EPA Region 8.
(B) June 23, 2000 letter from Dan Olson, Administrator, Wyoming Air Quality Division, to Richard R. Long, Program Manager, Air and Radiation, EPA Region VIII.
(30) On September 12, 2003, the Governor of Wyoming submitted a revision to the State Implementation Plan. The revision restructures the Wyoming Air Quality Standards and Regulations (WAQS&R) from a single chapter into thirteen separate chapters and renumbers the provisions within each chapter. The submitted revision contains no substantive changes to the existing SIP-approved regulations. The provisions listed in paragraph (c)(30)(i)(A) are approved into the SIP and supersede and replace the prior codification of the corresponding provisions of the SIP.
(i) Incorporation by reference.
(A) Wyoming Air Quality Standards and Regulations: Chapter 1: Section 2—Authority, Section 3—Definitions, Section 4—Diluting and concealing emissions, Section 5—Abnormal conditions and equipment malfunction; Chapter 2: Section 2—Ambient standards for particulate matter, paragraphs 2(a) and 2(c) only, Section 3—Ambient standards for nitrogen oxides, Section 4—Ambient standards for sulfur oxides, Section 5—Ambient standards for carbon monoxide, Section 6—Ambient standards for ozone, Section 8—Ambient standard for suspended sulfates, Section 10—Ambient standards for lead; Chapter 3: Section 2—Emission standards for particulate matter, Section 3—Emission standards for nitrogen oxides, Section 4—Emission standards for sulfur oxides, Section 5—Emission standards for carbon monoxide, Section 6—Emission standards for volatile organic compounds; Chapter 4: Section 2—Existing sulfuric acid production units, Section 3—Existing nitric acid manufacturing plants; Chapter 6: Section 2—Permit requirements for construction, modification and operation, Section 4—Prevention of significant deterioration; Chapter 7: Section 2—Continuous monitoring requirements for existing sources; Chapter 8: Section 2—Sweetwater County particulate matter regulations, Section 3—Conformity of general federal actions to state implementation plans; Chapter 9: Section 2—Visibility; Chapter 10: Section 2—Open burning restrictions, Section 3—Wood waste burners; Chapter 12: Section 2—Air pollution emergency episodes; Chapter 13: Section 2—Motor vehicle pollution control; all adopted September 13, 1999 and effective October 29, 1999.
(ii) Additional Material.
(A) Remainder of the September 12, 2003 State submittal.
(B) January 12, 2004 letter from Dan Olson, Wyoming Department of Environmental Quality (DEQ), to Richard Long, EPA Region VIII, to address typographical errors and incorrect cross references identified in the September 12, 2003 submittal.
(C) March 22, 2004 letter from Richard Long, EPA Region VIII, to John Corra, Wyoming DEQ, requesting clarification on the State's commitment to submit substantive SIP revisions following EPA's approval of the restructured and renumbered WAQS&R provisions. In this letter, EPA also asked DEQ to indicate time frames in which DEQ would submit substantive SIP revisions.
(D) March 29, 2004 letter from John Corra, Wyoming DEQ, to Richard Long, EPA Region VIII, addressing the concerns expressed in Mr. Long's March 22, 2004 letter.
[37 FR 10903, May 31, 1972. Redesignated at 71 FR 64462, Nov. 2, 2006]
Editorial Note:For Federal Register citations affecting § 52.2635, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
(a) Applicability. (1) This section applies to each owner and operator of the following emissions units in the State of Wyoming for which EPA approved the State's BART determination:
(i) FMC Westvaco Trona Plant Units NS-1A and NS-1B (PM and NOX);
(ii) TATA Chemicals Partners (previously General Chemical) Boilers C and D (PM and NOX);
(iii) Basin Electric Power Cooperative Laramie River Station Units 1, 2, and 3 (PM);
(iv) PacifiCorp Dave Johnston Power Plant Unit 3 (PM);
(v) PacifiCorp Dave Johnston Power Plant Unit 4 (PM and NOX);
(vi) PacifiCorp Jim Bridger Power Plant Units 1, 2, 3, and 4 (PM and NOX);
(vii) PacifiCorp Naughton Power Plant Units 1 and 2 (PM and NOX); and
(viii) PacifiCorp Wyodak Power Plant Unit 1 (PM).
(2) This section also applies to each owner and operator of the following emissions units in the State of Wyoming for which the EPA disapproved the State's BART determination and issued a SO2 and/or NOX BART Federal Implementation Plan:
(i) Basin Electric Power Cooperative Laramie River Station Units 1, 2, and 3;
(ii) PacifiCorp Dave Johnston Unit 3; and
(iii) PacifiCorp Wyodak Power Plant Unit 1.
(b) Definitions. Terms not defined below shall have the meaning given them in the Clean Air Act or EPA's regulations implementing the Clean Air Act. For purposes of this section:
(1) BART means Best Available Retrofit Technology.
(2) BART unit means any unit subject to a Regional Haze emission limit in Table 1 and Table 2 of this section.
(3) CAM means Compliance Assurance Monitoring as required by 40 CFR part 64.
(4) Continuous emission monitoring system or CEMS means the equipment required by this section to sample, analyze, measure, and provide, by means of readings recorded at least once every 15 minutes (using an automated data acquisition and handling system (DAHS)), a permanent record of SO2 and/or NOX emissions, diluent, or stack gas volumetric flow rate.
(5) FIP means Federal Implementation Plan.
(6) The term lb/hr means pounds per hour.
(7) The term lb/MMBtu means pounds per million British thermal units of heat input to the fuel-burning unit.
(8) NOX means nitrogen oxides.
(9) Operating day means a 24-hour period between 12 midnight and the following midnight during which any fuel is combusted at any time in the BART unit. It is not necessary for fuel to be combusted for the entire 24-hour period.
(10) The owner/operator means any person who owns or who operates, controls, or supervises a unit identified in paragraph (a) of this section.
(11) PM means filterable total particulate matter.
(12) SO2 means sulfur dioxide.
(13) Unit means any of the units identified in paragraph (a) of this section.
(c) Emissions limitations. (1) The owners/operators of emissions units subject to this section shall not emit, or cause to be emitted, PM, NOX, or SO2 in excess of the following limitations:
Table 1 to § 52.2636
[Emission limits for BART units for which EPA approved the State's BART and Reasonable Progress determinations]
Source name/BART unit
| PM emission
limits—
lb/MMBtu
| NOX emission
limits—
lb/MMBtu
(30-day
rolling
average)
|
---|
FMC Westvaco Trona Plant/Unit NS-1A | 0.05 | 0.35
|
FMC Westvaco Trona Plant/Unit NS-1B | 0.05 | 0.35
|
TATA Chemicals Partners (General Chemical) Green River Trona Plant/Boiler C | 0.09 | 0.28
|
TATA Chemicals Partners (General Chemical) Green River Trona Plant/Boiler D | 0.09 | 0.28
|
Basin Electric Power Cooperative Laramie River Station/Unit 1 | 0.03 | N/A
|
Basin Electric Power Cooperative Laramie River Station/Unit 2 | 0.03 | N/A
|
Basin Electric Power Cooperative Laramie River Station/Unit 3 | 0.03 | N/A
|
PacifiCorp Dave Johnston Power Plant/Unit 3 | 0.015 | N/A
|
PacifiCorp Dave Johnston Power Plant/Unit 4 | 0.015 | 0.15
|
PacifiCorp Jim Bridger Power Plant/Unit 1
1 | 0.03 | 0.26/0.07
|
PacifiCorp Jim Bridger Power Plant/Unit 2
1 | 0.03 | 0.26/0.07
|
PacifiCorp Jim Bridger Power Plant/Unit 3
1 | 0.03 | 0.26/0.07
|
PacifiCorp Jim Bridger Power Plant/Unit 4
1 | 0.03 | 0.26/0.07
|
PacifiCorp Naughton Power Plant/Unit 1 | 0.04 | 0.26
|
PacifiCorp Naughton Power Plant/Unit 2 | 0.04 | 0.26
|
PacifiCorp Wyodak Power Plant/Unit 1 | 0.015 | N/A
|
Table 2 to § 52.2636
[Emission limits and required control technologies for BART units for which the EPA disapproved the State's BART determination and implemented a FIP]
Source name/BART unit
| NOX Required Control Technology
| NOX emission
limit—lb/MMBtu
(30-day rolling
average)
| SO2 emission
limit—lb/MMBtu
(averaged annually across Units
1 and 2)
|
---|
Basin Electric Power Cooperative Laramie River Station/Unit 1
1 | Selective Catalytic Reduction (SCR)
2 |
4 0.18/0.06 | 0.12
|
Basin Electric Power Cooperative Laramie River Station/Unit 2
1 | Selective Non-catalytic Reduction (SNCR)
3 | 0.18/0.15
| |
Basin Electric Power Cooperative Laramie River Station/Unit 3
1 | Selective Non-catalytic Reduction (SNCR)
3 | 0.18/0.15 | N/A
|
PacifiCorp Dave Johnston Unit 3 | N/A | * 0.07 | N/A
|
PacifiCorp Wyodak Power Plant/Unit 1 | N/A | 0.07 | N/A
|
(2) These emission limitations shall apply at all times, including startups, shutdowns, emergencies, and malfunctions.
(d) Compliance date. (1) The owners and operators of PacifiCorp Jim Bridger Units 1, 2, 3, and 4 shall comply with the NOX emission limit of 0.26 lb/MMBtu and PM emission limit of 0.03 lb/MMBtu and other requirements of this section by March 4, 2019. The owners and operators of PacifiCorp Jim Bridger Units 1, 2, 3 and 4 shall comply with the NOX emission limit of 0.07 lb/MMBtu by: December 31, 2022 for Unit 1, December 31, 2021 for Unit 2, December 31, 2015, for Unit 3, and December 31, 2016, for Unit 4.
(2) The owners and operators of Laramie River Station Unit 1 shall comply with the NOX emission limit of 0.18 lb/MMBtu on June 19, 2019 and ending June 30, 2019. The owners and operators of Laramie River Station Unit 1 shall comply with the NOX emission limit of 0.06 lb/MMBtu on July 1, 2019. The owners and operators of the Laramie River Station Units 2 and 3 shall comply with the NOX emission limit of 0.18 lb/MMBtu on June 19, 2019 and ending on December 30, 2018. The owners and operators of Laramie River Station Units 2 and 3 shall comply with the NOX emission limit of 0.15 lb/MMBtu on December 31, 2018. The owners and operators of Laramie River Station Units 1 and 2 shall comply with the SO2 emission limit of 0.12 lb/MMBtu averaged annually across the two units on December 31, 2018.
(3) The owners and operators of the other BART sources subject to this section shall comply with the emissions limitations and other requirements of this section by March 4, 2019.
(4)(i) The owners and operators of PacifiCorp Dave Johnston Unit 3 will meet a NOX emission limit of 0.07 lb/MMBtu (30-day rolling average) by March 4, 2019; or
(ii) Alternatively, the owners and operators of PacifiCorp Dave Johnston Unit 3 will permanently cease operation of this unit on or before December 31, 2027.
(e) Compliance determinations for SO2 and NOX. (1) For all BART units other than Trona Plant units:
(i) CEMS. At all times after the earliest compliance date specified in paragraph (d) of this section, the owner/operator of each unit shall maintain, calibrate and operate a CEMS, in full compliance with the requirements found at 40 CFR part 75, to accurately measure SO2 and/or NOX, diluent, and stack gas volumetric flow rate from each unit. The CEMS shall be used to determine compliance with the emission limitations in paragraph (c) of this section for each unit.
(ii) Method. (A) For any hour in which fuel is combusted in a unit, the owner/operator of each unit shall calculate the hourly average NOX emission rates in lb/MMBtu at the CEMS in accordance with the requirements of 40 CFR part 75. At the end of each operating day, the owner/operator shall calculate and record a new 30-day rolling average emission rate in lb/MMBtu from the arithmetic average of all valid hourly emission rates from the CEMS for the current operating day and the previous 29 successive operating days.
(B) At the end of each calendar year, the owner/operator shall calculate the annual average SO2 emission rate in lb/MMBtu across Laramie River Station Units 1 and 2 as the sum of the SO2 annual mass emissions (pounds) divided by the sum of the annual heat inputs (MMBtu). For Laramie River Station Units 1 and 2, the owner/operator shall calculate the annual mass emissions for SO2 and the annual heat input in accordance with 40 CFR part 75 for each unit.
(C) An hourly average SO2 and/or NOX emission rate in lb/MMBtu is valid only if the minimum number of data points, as specified in 40 CFR part 75, is acquired by both the pollutant concentration monitor (SO2 and/or NOX) and the diluent monitor (O2 or CO2).
(D) Data reported to meet the requirements of this section shall not include data substituted using the missing data substitution procedures of subpart D of 40 CFR part 75, nor shall the data have been bias adjusted according to the procedures of 40 CFR part 75.
(2) For all Trona Plant BART units:
(i) CEMS. At all times after the compliance date specified in paragraph (d) of this section, the owner/operator of each unit shall maintain, calibrate, and operate a CEMS, in full compliance with the requirements found at 40 CFR part 60, to accurately measure NOX, diluent, and stack gas volumetric flow rate from each unit, including the CEMS quality assurance requirements in appendix F of 40 CFR part 60. The CEMS shall be used to determine compliance with the emission limitations in paragraph (c) of this section for each unit.
(ii) Method. (A) For any hour in which fuel is combusted in a unit, the owner/operator of each unit shall calculate the hourly average NOX emission rate in lb/MMBtu at the CEMS in accordance with the requirements of 40 CFR part 60. At the end of each operating day, the owner/operator shall calculate and record a new 30-day rolling average emission rate in lb/MMBtu from the arithmetic average of all valid hourly emission rates from the CEMS for the current operating day and the previous 29 successive operating days.
(B) An hourly average NOX emission rate in lb/MMBtu is valid only if the minimum number of data points, as specified in 40 CFR part 60, is acquired by both the pollutant concentration monitor (NOX) and the diluent monitor (O2 or CO2).
(f) Compliance determinations for particulate matter. Compliance with the particulate matter emission limit for each BART unit shall be determined from annual performance stack tests. Within 60 days of the compliance deadline specified in paragraph (d) of this section, and on at least an annual basis thereafter, the owner/operator of each unit shall conduct a stack test on each unit to measure particulate emissions using EPA Method 5, 5B, 5D, or 17, as appropriate, in 40 CFR part 60, Appendix A. A test shall consist of three runs, with each run at least 120 minutes in duration and each run collecting a minimum sample of 60 dry standard cubic feet. Results shall be reported in lb/MMBtu. In addition to annual stack tests, the owner/operator shall monitor particulate emissions for compliance with the BART emission limits in accordance with the applicable Compliance Assurance Monitoring (CAM) plan developed and approved by the State in accordance with 40 CFR part 64.
(g) Recordkeeping. The owner/operator shall maintain the following records for at least five years:
(1) All CEMS data, including the date, place, and time of sampling or measurement; parameters sampled or measured; and results.
(2) Records of quality assurance and quality control activities for emissions measuring systems including, but not limited to, any records required by 40 CFR part 75. Or, for Trona Plant units, records of quality assurance and quality control activities for emissions measuring systems including, but not limited to appendix F of 40 CFR part 60.
(3) Records of all major maintenance activities conducted on emission units, air pollution control equipment, and CEMS.
(4) Any other CEMS records required by 40 CFR part 75. Or, for Trona Plant units, any other CEMs records required by 40 CFR part 60.
(5) Records of all particulate stack test results.
(6) All data collected pursuant to the CAM plan.
(h) Reporting. All reports under this section shall be submitted to the Director, Office of Enforcement, Compliance and Environmental Justice, U.S. Environmental Protection Agency, Region 8, Mail Code 8ENF-AT, 1595 Wynkoop Street, Denver, Colorado 80202-1129.
(1) The owner/operator of each unit shall submit quarterly excess emissions reports for SO2 and/or NOX BART units no later than the 30th day following the end of each calendar quarter. Excess emissions means emissions that exceed the emissions limits specified in paragraph (c) of this section. The reports shall include the magnitude, date(s) and duration of each period of excess emissions, specific identification of each period of excess emissions that occurs during startups, shutdowns and malfunctions of the unit, the nature and cause of any malfunction (if known), and the corrective action taken or preventative measures adopted.
(2) The owner/operator of each unit shall submit quarterly CEMS performance reports, to include dates and duration of each period during which the CEMS was inoperative (except for zero and span adjustments and calibration checks), reason(s) why the CEMS was inoperative and steps taken to prevent recurrence, and any CEMS repairs or adjustments. The owner/operator of each unit shall also submit results of any CEMS performance tests required by 40 CFR part 75. Or, for Trona Plant units, the owner/operator of each unit shall also submit results of any CEMs performance test required appendix F of 40 CFR part 60 (Relative Accuracy Test Audits, Relative Accuracy Audits, and Cylinder Gas Audits).
(3) When no excess emissions have occurred or the CEMS has not been inoperative, repaired, or adjusted during the reporting period, such information shall be stated in the quarterly reports required by paragraphs (h)(1) and (2) of this section.
(4) The owner/operator of each unit shall submit results of any particulate matter stack tests conducted for demonstrating compliance with the particulate matter BART limits in paragraphs (c) of this section, within 60 calendar days after completion of the test.
(5) The owner/operator of each unit shall submit semi-annual reports of any excursions under the approved CAM plan in accordance with the schedule specified in the source's title V permit.
(i) Notifications. (1) The owner/operator shall promptly submit notification of commencement of construction of any equipment which is being constructed to comply with the SO2 and/or NOX emission limits in paragraph (c) of this section.
(2) The owner/operator shall promptly submit semi-annual progress reports on construction of any such equipment.
(3) The owner/operator shall promptly submit notification of initial startup of any such equipment.
(j) Equipment operation. At all times, the owner/operator shall maintain each unit, including associated air pollution control equipment, in a manner consistent with good air pollution control practices for minimizing emissions.
(k) Credible evidence. Nothing in this section shall preclude the use, including the exclusive use, of any credible evidence or information, relevant to whether a source would have been in compliance with requirements of this section if the appropriate performance or compliance test procedures or method had been performed.
[79 FR 5220, Jan. 30, 2014, as amended at 84 FR 10436, Mar. 21, 2019; 84 FR 22725, May 20, 2019]