§ 971.201 - Statement of financial resources.

(a) General. The application must contain information sufficient to demonstrate to the Administrator pursuant to § 971.301 that, upon issuance or transfer of the permit, the applicant will have access to the financial resources to carry out, in accordance with this part, the commercial recovery program set forth in the applicant's commercial recovery plan.

(b) Specific. In particular, the information on financial resources is expected to be general in nature but must include the likely sources and timing of funds to meet the applicant's scheduled expenditures in the recovery plan. These sources may include cash flow, reserves, and outside funding.

§ 971.202 - Statement of technological experience and capabilities.

(a) General. The application must contain information sufficient to demonstrate to the Administrator pursuant to § 971.301 that, upon issuance or transfer of the permit, the applicant will have the technological capability to carry out, in accordance with the regulations contained in this part, the commercial recovery program set out in the applicant's commercial recovery plan.

(b) Specific. In particular, the information submitted pursuant to this section must describe the equipment, knowledge, and skills the applicant possesses, or to which it can demonstrate access [see § 971.200(e)]. The information must include:

(1) A description of the technology or the equipment and methods to be used by the applicant in carrying out each step in the mining process, including nodule collection, retrieval, transfer to ship, environmental monitoring, transport to processing facilities, nodule processing, waste disposal and compliance with applicable water quality standards. The description must include:

(i) An analysis of the performance of experimental systems, sub-systems, or analogous machinery;

(ii) The rationale for extrapolating from test results to commercial mining. The more test data offered with the application the less analysis will be expected; and

(iii) Anticipated system reliability within the context of anticipated production time lost through equipment failure.

(2) A functional description of the types of technical persons on whom the applicant will rely to operate its equipment.

§ 971.203 - Commercial recovery plan.

(a) General. The application must include a proposed commercial recovery plan which describes the applicant's projected commercial recovery activities, in a general way, for the twenty year period to be covered by the proposed permit. Although preliminary and subject to change, the plan must be more detailed for that portion of the permit term leading up to the initiation of commercial recovery. The plan must include sufficient information for the Administrator, pursuant to this part, to make the necessary determinations pertaining to the certification and issuance or transfer of a permit and to the development and enforcement of the TCRs for a permit.

(b) Specific. The plan must include:

(1) A description of the activities proposed to be carried out during the period of the permit;

(2) The intended schedule of commercial recovery (see “Diligent commercial recovery,” § 971.503);

(3) Environmental safeguards and monitoring systems, which must take into account requirements under subpart F of this part, including best available technologies (BAT) (§ 971.604) and monitoring (§ 971.603);

(4) Details of the area or areas proposed for commercial recovery, which meet requirements for diligence (§ 971.503) and conservation of resources pursuant to subpart E (especially § 971.502);

(5) A resource assessment of the area or areas proposed for commercial recovery which meets the requirements for resource assessment and logical mining unit (§ 971.501);

(6) A description of the methods and technology to be used for commercial recovery and processing (see § 971.202(b)(1)); and

(7) The methods to be used for disposal of wastes from recovery and processing, including the areas for disposal and identification of any toxic substances in wastes.

§ 971.204 - Environmental and use conflict analysis.

(a) Environmental information submission. The application must be supported by sufficient marine environmental information for the Administrator to prepare an environmental impact statement (EIS) on the proposed mining activities, and to determine the appropriate permit TCRs based on environmental characteristics of the requested minesite. The Administrator may require the submission of additional data, in the event he determines that the basis for a suitable EIS, or a determination of appropriate TCRs, is not available.

(b)(1) In preparing the EIS, the Administrator will attempt to characterize the environment in such a way as to provide a basis for judging the potential for significant adverse effects or irreparable harm triggered by commercial mining (see subpart F). In compiling these data, the Administrator will utilize existing information including the relevant license EIS, additional exploration data acquired by the applicant, and other data in the public domain.

(2) The EIS must present adequate physical, chemical, and biological information for the permit area. If the permit area lies within the area of NOAA's Deep Ocean Mining Environmental Study (DOMES), the parameters listed in NOAA's Technical Guidance Document pertaining to the upper and lower water column should be included. Specifically, these parameters include:

(i) Upper water column—

Nutrients Endangered species Salinity, temperature, density Currents.

(ii) Lower water column and seafloor—

Currents Suspended particulate matter dispersion Sediment characteristics (mineralogy, particle size, shape and density, and water content) Topography Benthos.

(3) For a permit area outside the DOMES area, the applicant is encouraged to consult with NOAA at the earliest opportunity in order to determine the specific parameters to be measured based on the location and specific environmental characteristics of the permit area. The Administrator, in consultation with the Administrator of the Environmental Protection Agency and with the assistance of other appropriate Federal agencies, may determine that a programmatic EIS is required for any new area.

(c) The application must include a monitoring plan for test mining and at-sea commercial recovery activities which meets the objectives and requirements of § 971.603.

(d) Use conflict analysis. The application must include information known to the applicant on other uses of the proposed mining area to support the Administrator's determination regarding potential use conflicts between commercial mining activities and those activities of other nations or of other U.S. citizens.

(e) Onshore information. Because of NEPA requirements, the Administrator must include in the EIS on the proposed permit the complete spectrum of activities resulting from the issuance of a permit. Therefore, onshore information including the location and operation of nodule processing facilities must be submitted with the application in accordance with the details in § 971.606.

§ 971.205 - Vessel safety and documentation.

In order to provide a basis for the necessary determinations with respect to the safety of life and property at sea, pursuant to § 971.407, § 971.422 and Subpart G of this part, the application must contain the following information for vessels used in commercial recovery, except for those vessels under 300 gross tons which are engaged in oceanographic research:

(a) U.S. flag vessel. All mining ships and at least one of the transport ships used by each permittee must be documented under the laws of the United States. To the extent that the applicant knows which United States flag vessels it will use, it must include with its application copies of the vessels' current valid Coast Guard Certificates of Inspection.

(b) Foreign flag vessels. To the extent that the applicant knows which foreign flag vessel(s) it will be using for other purposes, the application must include evidence of the following:

(1) That any foreign flag vessel whose flag state is party to the International Convention for the Safety of Life at Sea, 1974 (SOLAS 74) possesses current valid SOLAS 74 certificates;

(2) That any foreign flag vessel whose flag state is not party to SOLAS 74 but is party to the International Convention for the Safety of Life at Sea, 1960 (SOLAS 60) possesses current valid SOLAS 60 certificates; and

(3) That any foreign flag vessel whose flag state is not a party to either SOLAS 74 or SOLAS 60 meets all applicable structural and safety requirements contained in the published rules of a member of the International Association of Classification Societies (IACS).

(c) Supplemental certificates. If the applicant does not know at the time of submitting an application which vessels it will be using, it must submit the applicable certification for each vessel before the cruise on which it will be used.

§ 971.206 - Statement of ownership.

(a) General. The application must include sufficient information to demonstrate that the applicant is a United States citizen.

(b) Specific. In particular, the application must include:

(1) Name, address, and telephone number of the United States citizen responsible for commercial recovery operations;

(2) A description of the citizen or citizens engaging in commercial recovery, including:

(i) Whether the citizen is a natural person, partnership, corporation, joint venture, or other form of association;

(ii) The state of incorporation or state in which the partnership or other business entity is registered;

(iii) The name and place of business of the registered agent or equivalent representative to whom notices and orders are to be delivered;

(iv) Copies of all essential and nonproprietary provisions in articles of incorporation, charter or articles of association; and

(v) The name of each member of the association, partnership, or joint venture, including information about the participation and/or ownership of stock of each partner or joint venturer.

§ 971.207 - Antitrust information.

In order to support the antitrust review referenced in § 971.211, the application must contain information sufficient, in the applicant's view and based on preapplication consultations pursuant to § 971.200(g), to identify the applicant and describe any significant existing market share it has with respect to the mining or marketing of the metals proposed to be recovered under the permit.

§ 971.208 - Fee.

(a) General. Section 104 of the Act provides that no application for the issuance or transfer of a permit will be certified unless the applicant pays to NOAA an administrative fee which reflects the reasonable administrative costs incurred in reviewing and processing the application.

(b) Amount. A fee payment of $100,000 payable to the National Oceanic and Atmospheric Administration, Department of Commerce, shall be submitted prior to or concurrent with each application; the application should state the method of payment and the date the payment was submitted. If the administrative costs of reviewing and processing the application are significantly less than or in excess of $100,000, the Administrator, after determining the amount of the under- or over-charge, as applicable, will refund the difference or require the applicant to pay the additional amount before issuance or transfer of the permit. In the case of an application for transfer of a permit to, or for a significant change to a permit held by, an entity which has previously been found qualified for a permit, the Administrator may reduce the fee in advance by an appropriate amount which reflects costs avoided by reliance on previous findings made in relation to the proposed transferee.

[54 FR 525, Jan. 6, 1989, as amended at 91 FR 2672, Jan. 21, 2026]
§ 971.209 - Processing outside the United States.

(a) Except as provided in this section and § 971.408, the processing of hard minerals recovered pursuant to a permit shall be conducted within the U.S., provided that the President or his designee does not determine that this restriction contravenes the overriding national interests of the United States.

(b) If foreign processing is proposed, the applicant shall submit a justification demonstrating the basis for a finding pursuant to § 971.408(a)(1). The justification shall include an analysis of each factor which the applicant considers essential to its conclusion that processing at a site within the U.S. is not economically viable.

(c) If the Administrator determines that the justification provided by the applicant is insufficient, or if the Administrator receives during the public comment or hearing period what the Administrator determines to be a serious alternative U.S. processing site proposal, the Administrator may require the applicant to supply, within a specified reasonable time, additional information relevant to the § 971.408(a)(1) finding.

(d) The applicant must include in its application satisfactory assurances that such resources after processing, to the extent of the permittee's ownership therein, will be returned to the United States for domestic use if the Administrator determines pursuant to § 971.408 that the national interest necessitates such return. Assurances must include proposed arrangements with the host country.

§ 971.200 - General.

(a) Who may apply; how. Any United States citizen holding a valid exploration license may apply to the Administrator for issuance of a commercial recovery permit for all or part of the area to which the license applies. Any holder of a commercial recovery permit may apply to the Administrator for transfer of the permit. Applications must be submitted in the form and manner described in this subpart.

(b) Place, form and copies. An application for the issuance or transfer of a commercial recovery permit shall be submitted in electronic format, verified and signed by an authorized officer or other authorized representative of the applicant, to an email address or website as specified by NOAA. The application format shall be organized according to the specific regulatory topics and sections. For applications received electronically after the close of business, for purposes of computing the Administrator's required response time, the application shall be deemed to be received at 8 a.m. eastern time on the next business day.

(c) General contents. The application must contain a proposed commerical recovery plan and the financial, technical, environmental and other information specified in this part, which in total are necessary for the Administrator to make the determinations required by the Act and this part. Although the ultimate standards for determinations under these rules are identical for both transferees and original preexisting licensees, NOAA anticipates that applicants who are transferees will have to supply more information with the application than licensees will [see subsection (e) in this section].

(d) Identification of requirements. Each portion of the application should identify the requirements of this part to which it responds.

(e) Information previously submitted in connection with an exploration license. Information previously submitted as part of an exploration license application, as well as information submitted during the course of license activities (such as data included in annual reports to NOAA), may be incorporated in the commercial recovery permit application by reference.

(f) Request for confidential treatment of information. If an applicant wishes to have any information in its application not be subject to public disclosure, it must so request, at the time of submitting the information, pursuant to § 971.802 which will govern disposition of the request.

(g) Pre-application consultation. The Administrator will make NOAA staff available to potential applicants for pre-application consultations on how to respond to the provisions of this part. In appropriate circumstances, the Administrator will provide written confirmation to the applicant of oral guidance resulting from such consultations. Such consultation is required for the purpose of § 971.207. The applicant is encouraged to consult with affected States as early as is practicable [see also §§ 971.213 and 971.606(b)].

(h) Compliance with Federal consistency requirements. An applicant for a commercial recovery permit must comply with all necessary requirements, including procedures, pursuant to 15 CFR part 930, subpart D. Applications and other necessary data and information must be transmitted to the designated State agency as prescribed under 15 CFR 930.50.

[54 FR 525, Jan. 6, 1989, as amended at 91 FR 2672, Jan. 21, 2026]
PROCEDURES
§ 971.210 - Determination whether application is complete for further processing.

Upon receipt of an application, the Administrator will review it to determine whether it includes information specifically identifiable with and fully responsive to each requirement in § 971.201 through § 971.209. The Administrator will notify the applicant whether the application is complete within 60 days after it is received. The notice will identify, if applicable, in what respects the application is not complete, and will specify the information which the applicant must submit in order to make it complete, why the additional information is necessary, and a reasonable date by which the application must be completed. Application processing will not begin until the Administrator determines that the application is complete.

§ 971.211 - Consultation and cooperation with Federal agencies.

(a) Promptly after receipt of an application that the Administrator has determined pursuant to § 971.210 is complete, the Administrator will distribute a copy of the application to every Federal agency or department which, pursuant to section 103(e) of the Act, has identified programs or activities within its statutory responsibilities which would be affected by the activities proposed in the application (e.g., the Departments of State, Transportation, Justice, Interior, Defense, Treasury and Labor, as well as the Environmental Protection Agency, Federal Trade Commission, International Trade Administration and National Science Foundation). Based on its legal responsibilities and authorities, each such agency or department may, not later than 60 days after it receives a copy of the application, recommend certification of the application, issuance or transfer of the permit, or denial of such certification, issuance or transfer. The advice or recommendation by the Attorney General or Federal Trade Commission on antitrust review, pursuant to section 103(d) of the Act, must be submitted within 90 days after their receipt of a copy of the application.

(b) NOAA will use this process of consultation and cooperation to facilitate necessary Federal decisions on proposed commercial recovery activities, pursuant to the mandate of section 103(e) of the Act to reduce the number of separate actions required to satisfy Federal agencies' statutory responsibilities. The Administrator will not issue or transfer the permit during the 90 day period after receipt by the Attorney General and the Federal Trade Commission except upon written confirmation of the Attorney General and the Federal Trade Commission that neither intends to submit further comments or recommendations with respect to the application.

(c) In any case in which a Federal agency or department recommends a denial, it must set forth in detail the manner in which the application does not comply with any law or regulation within its area of responsibility and how the application may be amended, or how TCRs might be added to the permit, to assure compliance with such law or regulation.

(d) NOAA will cooperate with such agencies and with the applicant with the goal of resolving any concerns raised and satisfying the statutory responsibilities of these agencies.

(e) If the Administrator decides to issue or transfer a permit with respect to which denial of the issuance or transfer has been recommended by the Attorney General or the Federal Trade Commission, or to issue or transfer a permit without imposing TCRs recommended by the Attorney General or the Federal Trade Commission, as appropriate, the Administrator will, before or at issuance or transfer of the permit, notify the Attorney General and the Federal Trade Commission of the reasons for his decision.

§ 971.212 - Public notice, hearing and comment.

(a) Notice and comments. The Administrator will publish in the Federal Register, for each complete application for issuance or transfer of a commercial recovery permit, notice that the application has been received. Subject to § 971.802, interested persons will be allowed to examine the materials relevant to the application, and will have at least 60 days after publication of notice to submit written comments to the Administrator.

(b) Hearings. After preparation of the draft environmental impact statement (EIS) on an application, the Administrator will hold a public hearing on the application and the draft EIS in an appropriate location and may employ additional methods he/she deems appropriate to inform interested persons about each application and to invite comments thereon. A hearing will be conducted in any State in which a processing plant or any of its ancillary facilities (such as a marine terminal or a waste disposal facility) are proposed to be located.

(c) If the Administrator determines there exist one or more specific and material factual issues which require resolution by formal processes, at least one formal hearing will be held in the District of Columbia metropolitan area in accordance with the provisions of Subpart I of this part. The record developed in any such formal hearing will be part of the basis of the Administrator's decisions on an application.

(d) Hearings held pursuant to this section and other procedures will be consolidated, if practicable, with hearings held and procedures employed by other Federal and State agencies.

§ 971.213 - Amendment to an application.

After an application has been submitted to the Administrator, but before a determination is made on the issuance or transfer of a permit, the applicant must submit an amendment to the application if there is a significant change in the circumstances represented in the original application which affects the requirements of this subpart. Applicants should consult with NOAA to determine if changes in circumstances are sufficiently significant to require submission of an amendment. The application, as amended, would then serve as the basis for determinations by the Administrator under this part. For each amendment judged by the Administrator to be significant, the Administrator will provide a copy of that amendment to each other Federal agency and department which received a copy of the original application, and also will provide for public notice, hearing and comment on the amendment pursuant to § 971.212. After the issuance or transfer of a permit, any revision of the permit will be made pursuant to § 971.413. Any amendment or modification which would cause coastal zone effects substantially different than those originally reviewed by the state agency would be subject to Federal consistency review as prescribed in 15 CFR part 930.

§ 971.214 - Consolidated license and permit procedures.

(a) Applicability and Order of Precedence. This section shall govern all consolidated applications that seek both an exploration license and a commercial recovery permit under the Act. Consolidated license and permit applications shall follow the requirements in this section and not the requirements set forth in §§ 970.200 through 970.208 of this chapter, §§ 970.400 through 970.408 of this chapter, and §§ 971.200 through 971.210, and 971.300 through 971.303. All other requirements set forth in 15 CFR parts 970 and 971 that are not in conflict with the requirements of this section shall apply to a consolidated license and permit application, and all the sections in part 970 of this chapter and this part, except for this section, shall continue to apply to individual license or permit applications. With respect to consolidated applications filed under this section, in the event of any conflict or inconsistency between any provision of this section and any provision of part 970 of this chapter and this part, the provision of this section shall control.

(b) Who may apply; how. Any United States citizen who can demonstrate that he, she, or it possesses the scientific, technical, and financial resources to pursue commercial recovery activities in an expeditious and diligent manner may apply to the Administrator for issuance or transfer of an exploration license and a commercial recovery permit using the “consolidated license and permit procedures” as set out in this section. Under these consolidated procedures, a qualified applicant may submit a single consolidated application that seeks both an exploration license and a commercial recovery permit. The Administrator shall issue an exploration license and a commercial recovery permit to the applicant if the application complies with the Act and regulations. The Administrator shall consolidate public hearings and other proceedings for the concurrent processing of the issue or transfer of the license or permit to the extent practicable. The Administrator may prepare a single environmental impact statement that evaluates the impacts of both exploration activities and commercial recovery activities, rather than one environmental impact statement for the exploration license and another environmental impact statement for the commercial recovery permit. Further, the Administrator shall prepare and issue separate proposals to issue or transfer the license or permit, in accordance with §§ 970.500 of this chapter and § 971.400; each proposed license or permit will have its own proposed terms, conditions, and restrictions.

(c) Application and form of applications. The application shall contain the information required in paragraph (d) of this section, in the order they appear. Each portion of the application shall identify the requirements of this section to which it responds. An applicant shall request to have any information in its application be kept confidential at the time of submitting the information. An applicant shall include information previously submitted that the applicant will rely on in the consolidated license and permit application. Applications shall be submitted electronically as specified by the Administrator. For applications received electronically after the close of business, for purposes of computing the Administrator's required response time, the application shall be deemed to be received at 8 a.m. eastern time on the next business day.

(d) Contents. The application shall contain information sufficient to enable the Administrator to make the findings set forth in 30 U.S.C. 1415(a) and 15 CFR 970.500(c), 971.214(e), and 971.400(c), including the items in paragraphs (d)(1) through (11) of this section.

(1) Past exploration description and statement of diligence. A statement by the applicant demonstrating that it possesses the scientific, technical, and financial resources to pursue commercial recovery activities in an expeditious and diligent manner, and detailed support for this statement. Support for this statement may include descriptions of past exploration activities or other relevant information, including, to the extent applicable, paragraphs (d)(1)(i) through (iii) of this section (to the extent this information is not applicable, the application should affirmatively state so):

(i) The description of past exploration activities shall contain information on what relevant work, if any, was performed prior to application submission by the applicant, the proposed transferor, or other entities prior to application. This description shall also include when the work was performed, what entity performed the work, the applicant's relationship to the entity performing the work, and the information collected as a result, including the items in paragraphs (d)(1)(i)(A) through (F) of this section:

(A) Survey cruises to determine the location and abundance of nodules as well as the sea floor configuration, ocean currents and other physical characteristics of potential commercial recovery sites;

(B) Assaying nodules to determine their metal contents;

(C) Designing and testing system components onshore and at sea;

(D) Designing and testing mining systems that simulate commercial recovery;

(E) Designing and testing processing systems to prove concepts and designing and testing systems that simulate commercial processing; and

(F) Evaluating the continued feasibility of commercial scale operations based on technical, economic, legal, and environmental considerations.

(ii) An explanation, with support, for why the applicant qualifies to use the consolidated license and permit procedures in this section, including demonstrating that the applicant possesses the scientific, technical, and financial resources to pursue commercial recovery activities in an expeditious and diligent manner. Support for this statement may include, but is not limited to, past exploration activities (described in paragraph (d)(1)(i) of this section), any other relevant prior work or experience of the applicant or affiliates of the applicant, including work in ocean exploration, mineral extraction, or processing, or other relevant information, such as access to or analysis of information regarding resource assessments or sea floor data, agreements with other entities experienced in deep-sea exploration or commercial recovery, access to or the development of relevant emergent technologies, or any other information the applicant deems to be relevant to and supportive of its assertion it is qualified to use the consolidated application.

(iii) Documentation of any agreements, contracts, or partnerships of other businesses or entities that the applicant will rely on for the various parts of any exploration or commercial recovery operations or financing.

(2) Statement of financial resources. Information sufficient to demonstrate that the applicant is capable of committing or raising sufficient resources to cover the estimated costs of the exploration program contained in the exploration plan and the commercial recovery program contained in the commercial recovery plan, required by paragraphs (d)(4) and (5) of this section, including general estimated costs of the exploration and commercial recovery plans. In addition to general estimated costs, the application shall provide an estimated schedule of expenditures that lists estimated expenditures for the work proposed in both the exploration plan and the recovery plan. Other information shall include, to the extent it is available, the most recent audited financial statement (for publicly-held companies, the most recent annual report and Form 10-K filed with the Securities and Exchange Commission) for the applicant and those entities upon which the applicant will rely to finance the exploration activities and the credit and bond rating of the applicant and such financing entities. An applicant may provide other economic analyses to demonstrate the ability to raise sufficient financial resources, including an internal rate of return (IRR) analysis.

(3) Statement of technological experience and capabilities. Information sufficient to demonstrate that the applicant possesses or has access to the technological capability to carry out the exploration program contained in the exploration plan and the commercial recovery program contained in the commercial recovery plan. In particular, the information submitted pursuant to this section shall describe the equipment, knowledge, and skills the applicant possesses or to which it can demonstrate access, including:

(i) A description of the exploration equipment to be used by the applicant in carrying out the exploration program;

(ii) A description of the environmental monitoring equipment to be used by the applicant in monitoring the environmental effects of the exploration program;

(iii) A description of the technology, equipment, and methods to be used by the applicant in carrying out each step in the mining process, including nodule collection, retrieval, transfer to ship, environmental monitoring, transport to processing facilities, nodule processing, waste disposal and compliance with applicable water quality standards. The description shall include:

(A) An analysis of the performance of experimental systems, sub-systems, or analogous machinery;

(B) The rationale for extrapolating from test results to commercial mining;

(C) Anticipated system reliability within the context of anticipated production time lost through equipment failure; and

(D) A functional description of the types of technical qualifications the applicant will require for persons operating its equipment.

(4) Exploration plan. A description of the applicant's proposed exploration activities including sufficient information for the Administrator to make the necessary determinations pertaining to the certification and issuance of a license and to the development and enforcement of the terms, conditions and restrictions (TCRs) for a license; and the specific items in paragraphs (d)(4)(i) through (iv) of this section:

(i) A description of the activities proposed to be carried out during the period of the license;

(ii) A description of the area that will be explored, including its delineation according to § 970.601 of this chapter;

(iii) The intended exploration schedule addressing which of the exploration activities in paragraphs (d)(4)(iii)(A) through (F) of this section the applicant intends to conduct after the issuance of the license and when each of these proposed activities will occur:

(A) Conducting survey cruises to determine the location and abundance of nodules as well as the sea floor configuration, ocean currents and other physical characteristics of potential commercial recovery sites;

(B) Assaying nodules to determine their metal contents;

(C) Designing and testing system components onshore and at sea, or an explanation as to why this is not necessary;

(D) Designing and testing mining systems which simulate commercial recovery, or an explanation as to why this is not necessary;

(E) Designing and testing processing systems to prove concepts and designing and testing systems which simulate commercial processing; and

(F) Evaluating the continued feasibility of commercial scale operations based on technical, economic, legal, political and environmental considerations;

(iv) For exploration activities that the applicant intends to conduct under an exploration license:

(A) A description of the methods to determine the location, abundance, and quality (i.e., assay) of nodules and to measure physical conditions in the area that will affect nodule recovery system design and operations (e.g., seafloor topography, seafloor geotechnical properties, and currents);

(B) A general description of the recovery and processing technology related to the proposed license and of any planned testing and evaluation of such technology addressing such factors as nodule collection technique, seafloor sediment rejection subsystem, mineship nodule separation scheme, pumping method, anticipated equipment test areas, and details on the testing plan; and

(C) Measures to protect the environment and to monitor the effectiveness of environmental safeguards and monitoring systems. These measures shall take into account the provisions in §§ 970.506, 970.518, 970.522 of this chapter and subpart G of part 970 of this chapter.

(5) Commercial Recovery Plan. Description of the applicant's projected commercial recovery activities for the twenty-year period to be covered by the proposed permit, including: sufficient information for the Administrator to make the necessary determinations pertaining to the certification and issuance of a permit and to the development and enforcement of the TCRs for a permit; and the specific items in paragraphs (d)(5)(i) through (vii) of this section:

(i) A description of the activities proposed to be carried out during the period of the permit;

(ii) The intended schedule of commercial recovery (see “Diligent commercial recovery,” § 971.503);

(iii) Environmental safeguards and monitoring systems, which may evolve over time in light of the findings of any environmental impact statements (EIS) that the Administrator prepares on the proposed activities in the consolidated license and permit application and as required for project development phases and shall take into account requirements under subpart F of this part, including best available technologies (BAT) (§ 971.604) and monitoring (§ 971.603);

(iv) Details of the area or areas proposed for commercial recovery, which meet requirements for diligence (§ 971.503) and conservation of resources pursuant to subpart E of this part (including § 971.502);

(v) A resource assessment of the area or areas proposed for commercial recovery which addresses the requirements for resource assessment and logical mining unit (§ 971.501) to the extent practicable. The resource assessment may be preliminary at the time of application and may be supplemented following completion of any EISs or during the duration of the license or permit, as additional information is collected;

(vi) A description of the methods and technology to be used for commercial recovery and processing (see § 971.202(b)(1)); and

(vii) The methods to be used for disposal of wastes from recovery and processing, including the areas for disposal and identification of any toxic substances in wastes.

(6) Environmental and use conflict analysis. Sufficient marine environmental information for the Administrator to prepare any environmental impact statements (EIS) on the proposed activities in the consolidated license and permit application and to determine the appropriate permit TCRs, including the items in paragraphs d(6)(i) through (iv) of this section. The Administrator may require the submission of additional data in the event the Administrator determines that the bases for suitable EISs or a determination of appropriate TCRs is not available.

(i) Physical, chemical and biological information describing the environmental characteristics of the relevant area, including relevant environmental information obtained during past exploration activities;

(ii) A monitoring plan for any proposed but not yet completed exploration activities, including test mining, and any at-sea commercial recovery activities that meet the objectives and requirements of § 971.603. The monitoring plan may be preliminary at the time of application and shall be finalized following completion of any EISs and in coordination with the development of the TCRs, incorporating relevant environmental data, impact modeling, and assessment outcomes;

(iii) Information known to the applicant on other uses of the proposed mining area to support the Administrator's determination regarding potential use conflicts between commercial mining activities and those activities of other nations or of other U.S. citizens and to assist the Administrator in making determinations related to potential use conflicts pursuant to §§ 970.503, 970.505, and 970.520 of this chapter, and §§ 971.403, 971.405, and 971.421; and

(iv) Onshore information including the location and operation of nodule processing facilities in accordance with § 971.606.

(7) Vessel safety and documentation. In order to provide a basis for the necessary determinations with respect to the safety of life and property at sea, the application shall contain the information in paragraphs (d)(7)(i) through (iii) of this section for vessels used for the purposes covered by the application, except for vessels under 300 gross tons which are engaged in oceanographic research:

(i) U.S. flag vessel. A demonstration or affirmation that any U.S. flag vessel used in exploration activities shall possess a current valid Coast Guard Certificate of Inspection (COI). All mining ships and at least one of the transport ships used by each permittee shall be documented under the laws of the United States. To the extent that the applicant knows which U.S. flag vessels it will use, it shall include with its application copies of the vessels' current valid Coast Guard COIs.

(ii) Foreign flag vessels. To the extent that the applicant knows which foreign flag vessel(s) it will be using for other purposes, the application shall include evidence that:

(A) Any foreign flag vessel whose flag state is party to the International Convention for the Safety of Life at Sea, 1974 (SOLAS 74) possesses current valid SOLAS 74 certificates;

(B) Any foreign flag vessel whose flag state is not party to SOLAS 74 but is party to the International Convention for the Safety of Life at Sea, 1960 (SOLAS 60) possesses current valid SOLAS 60 certificates; and

(C) Any foreign flag vessel whose flag state is not a party to either SOLAS 74 or SOLAS 60 meets all applicable structural and safety requirements contained in the published rules of a member of the International Association of Classification Societies (IACS).

(iii) Supplemental certification. If the applicant does not know at the time of submitting an application which vessels it will be using, it shall submit the applicable certification to the Administrator for each vessel before the cruise on which it will be used.

(8) Statement of Ownership. Sufficient information to demonstrate that the applicant is a U.S. citizen, including:

(i) Name, address, and telephone number of the U.S. citizen responsible for exploration and commercial recovery operations to whom notices and orders are to be delivered; and

(ii) A description of the citizen or citizens engaging in such exploration and commercial recovery, including:

(A) Whether the citizen is a natural person, partnership, corporation, joint venture, or other form of association;

(B) The state of incorporation or state in which the partnership or other business entity is registered;

(C) The name of the registered agent or equivalent representative and places of business;

(D) Copies of essential and nonproprietary provisions in articles of incorporation, charter or articles of association; and

(E) The name of each member of the association, partnership, or joint venture, including information about the participation of each partner and joint venturer and/or ownership of stock.

(9) Antitrust information. In order to facilitate antitrust review pursuant to section 103(d) of the Act, the application shall contain:

(i) A copy of each agreement between any parties to any joint venture which is submitting a consolidated license and permit application, provided that said agreement relates to deep seabed hard mineral resource exploration or commercial recovery;

(ii) The identity of any affiliate, as defined in § 970.101(d) of this chapter, of any person submitting a consolidated license and permit application; and

(iii) For each applicant, its affiliate, or parent or subsidiary of an affiliate which is engaged in production in, or the purchase or sale in or to, the United States of copper, nickel, cobalt or manganese minerals or any metals refined from these minerals:

(A) The annual tons and dollar value of any of these minerals and metals so purchased, sold or produced for the two preceding years;

(B) Copies of the annual report, balance sheet and income statement for the two preceding years; and

(C) Copies of each document submitted to the Securities and Exchange Commission.

(10) Fee. A fee payment of $350,000 payable to the National Oceanic and Atmospheric Administration, Department of Commerce, shall be submitted prior to or concurrent with each application; the application should state the method of payment and the date the payment was submitted. If the administrative costs of reviewing and processing the application are significantly less than or in excess of $350,000, the Administrator shall refund the difference or require the applicant to pay the additional amount before issuance or transfer of the license or permit. In the case of an application for transfer of a license or permit to, or for a significant change to a license or permit held by, an entity that has previously been found qualified for a permit, the Administrator may reduce the fee in advance by an appropriate amount which reflects costs avoided by reliance on previous findings made in relation to the proposed transferee. Payment of the application fee does not determine priority of right.

(11) Processing outside the United States. Except as provided in this section and § 971.408, the processing of nodules recovered pursuant to a permit shall be conducted within the United States, provided that the President or his designee does not determine that this restriction contravenes the overriding national interests of the United States. The application shall contain the information outlined in § 971.408 if applicable.

(e) Certification. To the maximum extent practicable, the Administrator shall certify a consolidated application within 100 days of the submission of an application which is in full compliance. If final certification or denial of certification has not occurred within 100 days after submission of the application, the Administrator shall inform the applicant in writing of the then pending unresolved issues, the agency's efforts to resolve them, and an estimate of the time required to do so. Certification shall occur after consultation with other departments and agencies pursuant to § 970.211 of this chapter and § 971.211 and determining in writing that:

(1) The applicant is qualified to use this consolidated license and permit application procedure as the applicant has demonstrated that the applicant possesses the scientific, technical, and financial resources to pursue commercial recovery activities in an expeditious and diligent manner.

(2) The issuance or transfer of the license and the permit would not violate any of the restrictions of 15 CFR 970.103(b) or 971.103(b).

(3) The size and location of the exploration and commercial recovery area selected by the applicant is approved, and this approval shall occur unless the Administrator determines that the area is not a logical mining unit under § 970.601 of this chapter and § 971.501, or commercial recovery activities in the proposed area would result in a significant adverse environmental effect which cannot be avoided by imposition of reasonable restrictions.

(4) The applicant:

(i) Has demonstrated that, upon issuance or transfer of the license and the permit, the applicant shall be financially responsible to meet all obligations which may be required to engage in its proposed exploration and commercial recovery activities;

(ii) Has demonstrated that, upon issuance or transfer of the license and the permit, the applicant shall possess or have access to the technological capability to engage in the proposed exploration and commercial recovery;

(iii) Has satisfactorily fulfilled all past obligations under any license or permit previously issued or transferred to the applicant under the Act;

(iv) Has an exploration plan which meets the requirements of paragraph (d)(4) of this section;

(v) Has a commercial recovery plan which meets the requirements of paragraph (d)(5) of this section; and

(vi) Has paid the application fee specified in paragraph (d)(10) of this section.

(f) Denial of certification. The Administrator may deny certification of an application if it does not meet the requirements of paragraph (e) of this section or the requirements for issuance or transfer under §§ 970.503 through 970.507 of this chapter or §§ 971.403 through 971.408. The Administrator shall send to the applicant and publish in the Federal Register written notice of a proposed denial of certification.

(1) Such notice shall include:

(i) The basis for the denial;

(ii) If the basis for the proposed denial is because the applicant is not qualified to use the consolidated procedures under this subsection:

(A) The reasons for that determination;

(B) The time within which the applicant may submit an amended application for an exploration license under part 970 of this chapter without disturbing the applicant's priority of right, which shall be 60 days except as specified by the Administrator for good cause; and

(C) The number of days from receipt of the amended application in which the Administrator shall certify or deny certification of the amended application in accordance with 15 CFR 970.400. The Administrator shall endeavor to complete certification of an amended application within 50 days of receipt.

(iii) If the basis for the proposed denial is a deficiency that the applicant can correct:

(A) How to correct the deficiency; and

(B) The time within which the corrected application shall be submitted, which shall not exceed 180 days except as specified by the Administrator for good cause.

(2) The Administrator shall deny certification:

(i) On the 30th day after the date the notice is sent to the applicant, under paragraph (f) of this section unless before that date the applicant files with the Administrator a written request for an administrative review of the proposed denial; or

(ii) On the last day of the period established under paragraph (f)(1)(ii)(B) of this section during which the applicant may submit an amended application for an exploration license under part 970 of this chapter, if the applicant fails to submit such an amended application before such day and an administrative review requested pursuant to paragraph (f)(2)(i) of this section is not pending;

(iii) On the last day of the period established under paragraph (f)(1)(iii)(B) of this section during which the applicant may correct a deficiency, if such deficiency has not been corrected before such day and an administrative review requested pursuant to paragraph (f)(2)(i) of this section is not pending.

(3) If a timely request for administrative review of the proposed denial is made by the applicant under paragraph (f)(2)(i) of this section, the Administrator shall promptly begin a formal hearing in accordance with subpart I of this part. If the proposed denial is the result of a correctable deficiency, the administrative review shall proceed concurrently with any attempts to correct the deficiency, unless the parties agree otherwise or the administrative law judge orders differently.

(4) The Administrator shall send the applicant written notice of any denial of certification including the reasons therefore.

(5) Any final determination granting or denying certification is subject to judicial review as provided in chapter 7 of title 5, United States Code.

(g) Effect of this section on pending applications. Within 60 days of this rule becoming final, an applicant who has an application for a license pending before the Administrator may notify the Administrator in writing of its intention to proceed under these consolidated procedures. Such applicants shall submit an amended application that complies with this subpart, and the amended application shall be processed in accordance with this subpart, except that any work, actions or decisions by NOAA, including required findings at various stages of the application process, shall continue to apply to the extent still applicable.

[91 FR 2672, Jan. 21, 2026]
authority: 30 U.S.C. 1401
source: 54 FR 525, Jan. 6, 1989, unless otherwise noted.
cite as: 15 CFR 971.206