(a) Each application for authority to assign or transfer control of an interest in a cable system shall contain information pursuant to §§ 1.70002(b) and (c) and 1.70004(a). The application shall contain a certification as to whether or not the licensee, assignor/transferor, or assignee/transferee exhibit any of the criteria set out in the presumptive disqualifying conditions under §§ 1.70002(c)(1) and 1.70004(a)(1).
(b) An application for authority to assign or transfer control of an interest in a cable system shall contain a narrative description of the proposed transaction, including relevant facts and circumstances. The application shall also include the following information:
(1) The information requested in § 1.70005(a) through (c) for both the assignor/transferor and the assignee/transferee.
(2) The information required in § 1.70005(d) through (f).
(3) A narrative describing the means by which the assignment or transfer of control will take place.
(4) The information and certifications required in § 1.70005(j) for the assignee or the transferee and the licensee that is the subject of the transfer of control.
(5) The application shall also specify, on a segment specific basis, the percentage of voting and ownership interests being assigned or transferred in the cable system, including in the U.S. portion of the cable system (which includes all U.S. cable landing station(s)).
(6) The information and certifications required in § 1.70005(g) and (m), except as specified in paragraph (b)(7) of this section, for each assignee or licensee that is the subject of a transfer of control.
(7) The certifications set forth in § 1.70006, except for § 1.70006(d). A licensee seeking an assignment or transfer of control of a cable landing license must certify in the application that it has created, updated, and implemented a cybersecurity and physical security risk management plan, consistent with §§ 1.70006(c) and 1.70007(q). The application must also include a certification that the assignee or the transferee and the licensee that is the subject of the transfer of control accepts and will abide by the routine conditions specified in § 1.70007.
(8) In the event the transaction requiring an assignment or transfer of control application also requires the filing of a foreign carrier affiliation notification pursuant to § 1.70009, the application shall reference the foreign carrier affiliation notification and the date of its filing.
(9) The Commission reserves the right to request additional information concerning the transaction to aid it in making its public interest determination.
(10) An assignee or transferee must notify the Commission no later than thirty (30) days after either consummation of the assignment or transfer or a decision not to consummate the assignment or transfer. The notification shall identify the file numbers under which the initial license and the authorization of the assignment or transfer were granted.
[90 FR 48699, Oct. 27, 2025]