In addition to the requirements of §§ 400.21(d)(1)(i) and (ii) pertaining to legal authority, § 400.21(d)(2)(vii) pertaining to environmental aspects of the proposal, and § 400.21(d)(3)(i) and (iii) pertaining to operation, a grantee's application for subzone designation shall contain the following information:
(a) The name of the operator/user for which subzone designation is sought;
(b) The nature of the activity at the proposed subzone;
(c) The address(es) and physical size (acreage or square feet) of the proposed subzone location(s); and
(d) One or more maps conforming to the requirements of section § 400.21(d)(5)(ii). For any production activity to be conducted at a proposed subzone, the separate requirements of § 400.14(a) must be met.
authority: Foreign-Trade Zones Act of June 18, 1934, as amended (Pub. L. 73-397, 48 Stat. 998-1003 (
19 U.S.C. 81a-81u))
source: 77 FR 12139, Feb. 28, 2012, unless otherwise noted.
cite as: 15 CFR 400.25