The Administrator shall carry out a program the primary purpose of which is to prepare infrastructure at the Kennedy Space Center that is needed to enable processing and launch of the Space Launch System. Vehicle interfaces and other ground processing and payload integration areas should be simplified to minimize overall costs, enhance safety, and complement the purpose of this section.