U.S Code last checked for updates: May 03, 2024
§ 76q–1.
John F. Kennedy Center Plaza
(a)
Definitions
In this section, the following definitions apply:
(1)
Air rights
(2)
Center
(3)
Green spaces
(4)
Plaza
(5)
Project
(6)
Secretary
(7)
TEA–21 report
(b)
Responsibilities of the Secretary
(1)
In general
(2)
Planning, design, engineering, and construction
(3)
Agreements with the Board and other agencies
(4)
Consultation with the Board
(5)
Contracts
(6)
Project Team
(A)
Establishment
(B)
Membership
The Project Team shall be composed of the following members:
(i)
The Secretary (or the Secretary’s designee).
(ii)
The Administrator of General Services (or the Administrator’s designee).
(iii)
The Chairman of the Board (or the Chairman’s designee).
(iv)
Such other individuals as the Project Team considers appropriate.
(C)
Project Director
(c)
Responsibilities of the Board
(1)
In general
(2)
Receipt of transfers of air rights
(3)
Construction of buildings
(4)
Acknowledgment of contributions
(A)
In general
(B)
Applicability of other requirements
(5)
Approval by Project Team
(d)
Responsibilities of the District of Columbia
(1)
Modification of highway system
(2)
Conveyances
(A)
Authority
(B)
Conveyance to the Board
(3)
Agreements with the Board
(e)
Ownership
(1)
Roadways and sidewalks
(2)
Maintenance of green spaces
(3)
Buildings and green spaces on the Plaza
(f)
National highway boundaries
(1)
Realignment of boundaries
(2)
Access to Center from I–66
(g)
GAO review
(Pub. L. 85–874, § 12, as added Pub. L. 107–224, § 2(2), Sept. 18, 2002, 116 Stat. 1340; amended Pub. L. 108–410, § 3, Oct. 30, 2004, 118 Stat. 2303.)
cite as: 20 USC 76q-1