The fact that a Y2K failure occurred in an entity, facility, system, product, or component that was sold, leased, rented, or otherwise within the control of the party against whom a claim is asserted in a Y2K action shall not constitute the sole basis for recovery of damages in that action. A claim in a Y2K action for breach or repudiation of contract for such a failure is governed by the terms of the contract.