Editorial Notes
Amendments

2023—Subsecs. (e), (f). Pub. L. 118–31 added subsec. (e) and redesignated former subsec. (e) as (f).

2021—Pub. L. 116–283, § 2805(a), amended section generally. Prior to amendment, section related to energy resilience and conservation construction projects.

Subsecs. (c), (d). Pub. L. 117–81 added subsec. (c) and redesignated former subsec. (c) as (d). Former subsec. (d) redesignated (e).

Pub. L. 116–283, § 2823(b), added subsec. (c) and redesignated former subsec. (c) as (d).

Subsec. (e). Pub. L. 117–81, § 2804(1), redesignated subsec. (d) as (e).

2018—Pub. L. 115–232 substituted “resilience” for “resiliency” in section catchline.

2017—Pub. L. 115–91, § 2831(c)(1), substituted “energy resilience” for “energy resiliency” wherever appearing in text.

Subsec. (b)(1). Pub. L. 115–91, § 2801(e)(1), struck out “in writing” after “shall notify” and “or, if earlier, the end of the 14-day period beginning on the date on which a copy of the notification is provided” after “received by such committees” and substituted “14-day period” for “21-day period”.

2016—Pub. L. 114–328, § 2805(a)(1)(A), inserted “resiliency and” before “conservation construction projects” in section catchline. Text quoted in directory language of amendment was editorially conformed to the style of the catchline.

Subsec. (a). Pub. L. 114–328, § 2805(a)(1)(B), substituted “military construction project for energy resiliency, energy security, or energy conservation” for “military construction project for energy conservation”.

Subsec. (b). Pub. L. 114–328, § 2805(b)(1)(A), designated existing provisions as par. (1) and added par. (2).

Subsec. (c). Pub. L. 114–328, § 2805(b)(2), added subsec. (c).

Statutory Notes and Related Subsidiaries
Effective Date of 2016 Amendment

Pub. L. 114–328, div. B, title XXVIII, § 2805(b)(1)(B), Dec. 23, 2016, 130 Stat. 2714, provided that: “The amendment made by subparagraph (A) [amending this section] shall apply with respect to notifications provided during fiscal year 2017 or any succeeding fiscal year.”